Laserfiche WebLink
Mr. Philip Isorena Proposal P93-040.31 <br /> July 12, 1993 <br /> Page 2 <br /> Task 2. Resample the seven B-zone groundwater monitoring wells (one <br /> upgradient and six downgradient) to confirm the earlier analytical <br /> results from previous investigations. <br /> Task 3. Evaluate the origin of data gaps identified in the IPAR. <br /> Task 4. Perform a limited phase I assessment of properties and facilities <br /> surrounding the terminals. <br /> Task 5. Conduct a cone penetrometer testing (CPT)to evaluate site stratigraphy <br /> in areas not previously evaluated and below the B-zone in and <br /> downgradient of the terminals. <br /> Task 6. Evaluate the vertical extent of petroleum hydrocarbon impact using <br /> field survey techniques utilizing the HydroPuncho II sampling system. <br /> Task 7. Install groundwater monitoring wells to monitor deeper water-bearing <br /> zones. <br /> Task 8. Analyze groundwater samples collected during field screening and <br /> from groundwater monitoring wells. <br /> Task 9. Conduct a biodegradation assessment program by evaluating current <br /> environmental conditions and potential bio-enhancement techniques. <br /> Task 10. Perform aquifer tests (slug tests) and bail down tests to determine <br /> preliminary aquifer parameters and the product thickness, respectively. <br /> Task 11. Conduct an interim product recovery program utilizing passive product <br /> recovery devices. <br /> Task 12. Prepare a report documenting the results of the phase H assessment. <br /> Task 13. Project management, coordinate with the RWQCB, and prepare <br /> monthly progress reports. <br /> SAC/PRO,P931P9304031.bc-93 Imc:S <br />