Laserfiche WebLink
CHRONOLOGY <br /> -8- <br /> September 1988, and there is no evidence of hydrocarbon contam- <br /> ination onsite. <br /> 03-21-89 San Joaquin County Grand Jury (1988-1989) investigation on the <br /> PS gasoline leak finds Time Oil responsible for the 8 February <br /> 1988 spill onsite, costs to the fire department and SJLHD must <br /> be recovered, RB effectiveness is curtailed by inadequacy of <br /> staff and high turnover in personnel, and the DA does not re- <br /> ceive full cooperation from RB staff. <br /> 03-31-89 SUP letter transmits 1985 pressure tests data; a report on <br /> chromatograms interpretation indicating contamination from <br /> gasousedlbyeSFPP)Seandaadreportres fromut no TracerP-4 fuel Research(only produt <br /> indicatingcno <br /> leaks in SUP pipelines. All information was submitted in <br /> conjunction with SFPP's request to be taken out of C&A. <br /> 04-07-89 ST letter to SJLHD regarding removal of a 10,000-gallon under- <br /> ground tank (Tank 2) and a 4,000-gallon tank (Tank 4). Tank 2 <br /> will be replaced with a 10,000-gallon aboveground tank and Tank <br /> 4 with a 6,000-gallon fiberglass underground tank. <br /> 04-14-89 Attendance sheet of staff meeting with SJLHD and PS and its <br /> tenants. <br /> 04-19-89 Staff memo discusses meeting of 04-14-89 and summarizes com- <br /> ments on all reports submitted by PS and its tenants to date. <br /> 05-03-89 SUP transmits "Groundwater Investigation and Environmental <br /> Assessment, Stockton Terminal, Stockton California, April 28, <br /> 1989. " <br /> 05-03-89 TC letter says work plan discussed at 04-14-89 meeting will be <br /> submitted 08-01-89 and include first two actions specified in <br /> the draft C&A: (1) Feasibility study (FS) for interim fuel <br /> product recovery; and (2) Plan for complete definition of on- <br /> and off-site contamination. <br /> 05-03-89 Staff letter transmits 04-19-89 memo to PS and specifies dead- <br /> lines of 06-30-89 and 08-01-89 for a comprehensive report and <br /> an FS for product recovery, respectively. The comprehensive <br /> report shall contain an interpretation of all existing data and <br /> proposal for future work with a time schedule. The letter also <br /> states that staff would not recommend adoption of the C&A if <br /> the deadlines are met, all staff comments are addressed, and <br /> the TC members enter a formal agreement to complete the inves- <br /> tigation and remediation. <br /> 05-19-89 Staff memo finds SFPP report provided inconclusive evidence to <br /> be taken out of the C&A. <br />