Laserfiche WebLink
Nolte and Associates Inc. • • <br /> c MONITORING WELLS <br /> Locations of well screens will be in accordance with the drawings or per the direction of the <br /> Engineer. <br /> Well centralizers, if deemed necessary by the Contractor to maintain appropriate plumb, shall be <br /> PVC and shall be attached to the casing using stainless steel. <br /> C. Grout and Seal <br /> Grout will be composed by weight of 10 parts Portland cement to 1/2 part bentonite, with a <br /> maximum of 10 gal of approved water per 94 lb bag of cement. Bentonite will be added after <br /> mixing of the cement and water. Bentonite pellets used in the seal will be a commercially <br /> available product designed for well sealing. <br /> Bentonite sealing material above the gravel pack shall be high quality bentonite clay as <br /> manufactured by Volclay or equal. <br /> D. Gravel Pack <br /> Gravel pack shall be sand composed of sound durable particles and shall be free of organic <br /> matter, clay balls, and other deleterious substances. Sand material used in the pack around the <br /> well screen will be selected to be compatible with both the screen slot size and aquifer materials. <br /> Gravel pack for the monitoring wells shall have an approximate Dlo of 0.02 in. This size may be <br /> changed depending on the results of the formation sample sieve analysis. The pack shall have a <br /> uniformity coefficient less than 2.5. The pack shall be properly cleaned and bagged by the <br /> supplier. <br /> A sample of the pack material proposed to be used, with sieve analysis, shall be submitted to the <br /> Engin or ap rov obtained in writing before any�ack material is delivered to the well sites. <br /> E. Protective Casing, Load Rated Well Box/Cover, Well Access <br /> A 10 in. protective steel casing will be installed around each well. This protective casing will <br /> extend approximately 2 ft above land surface and will be seated 3 ft into the well seal grout. <br /> The protective casing will be vented to the atmosphere by a lockable, hinged cap. This cap will <br /> prevent entry of water but will not be airtight. In this manner, the well will be in open <br /> connection to the atmosphere to allow for water level stabilization. In addition, a 1/4 in. <br /> diameter drainage port will be installed centered 1/8 in. above the level of the concrete pad. <br /> The top of the well casing will have a removable Sch 40 PVC oversized cap to prevent well <br /> contamination. <br /> Contractor shall furnish heavy duty padlocks, Master, American, or equal for all monitoring <br /> wells. The same key will be used for all monitoring well padlocks at the site. <br /> 4 <br />