J • <br /> 0 LFR <br /> • B-zone monitoring wells were installed on the Kawai property (MW-211B) and on Benjamin <br /> Holt near Harrisburg Place (MW-213B) from January 18 through 29, 1999, as part of the <br /> Plume Perimeter Investigation (Locations 20 and 21B, respectively, on Figure 1). <br /> • A magnetometer survey was conducted on January 19, 1999, at the site occupied by Michael's <br /> Arts and Crafts (previously owned by Safeway) in an attempt to locate a reportedly abandoned <br /> well. No objects were identified that could be associated with the former well. <br /> • Monitoring of the operation of the Phase I Interim Remedial Action (IRA) groundwater <br /> extraction and treatment system (GWETS), which includes routine sampling, automated <br /> measurement, and logging of the system flow rates and other operational parameters, continued <br /> throughout the bimonthly period. The treatment system operated continuously during the <br /> reporting quarter, except as noted below. <br /> • On November 30, 1998, a shutdown occurred when the electrical power to the treatment <br /> system fluctuated, resulting in low supplied voltage to the treatment system. System repairs <br /> and upgrades were made and the system was restarted on December 24, 1998. <br /> • On December 25, 1998, a shutdown occurred because of a voltage overload caused by a <br /> constriction on the shaft of the pump. The pump shaft was realigned, and the GWETS was <br /> restarted on December 27, 1998. <br /> • On December 30, 1998, the GWETS was off line from 10:30 to 13:10 because of a power <br /> outage. <br /> • Fluid levels in selected groundwater wells were measured for the purpose of assessing the <br /> effectiveness of groundwater extraction well capture on December 2 and 16, 1998, and on <br /> January 6, 13, and 27, 1999. <br /> • Access negotiations continued with Bank of America to obtain permission to conduct remedial <br /> investigation activities on their property located at 503 W. Benjamin Holt Drive. <br /> Data Collection and Field Activities Anticipated for February and March 1999 <br /> The following data collection and field activities are planned at the Site during the next bimonthly <br /> period, or have commenced or been completed since the end of the bimonthly period: <br /> • One B-zone monitoring well was installed on Gunton Way (MW-212B) from February 2 <br /> through 5, 1999, as part of the Plume Perimeter Investigation (Location 23 on Figure 1). <br /> • All newly installed Remedial Investigation CPT/PIPP borings and monitoring wells were <br /> surveyed on February 10, 1999. <br /> bimonthly-Feb99-041 I l.doc:blh 2 <br />