My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_1998-2000
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
0
>
2900 - Site Mitigation Program
>
PR0506203
>
SITE INFORMATION AND CORRESPONDENCE_1998-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 3:10:51 PM
Creation date
3/31/2020 2:34:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1998-2000
RECORD_ID
PR0506203
PE
2960
FACILITY_ID
FA0007271
FACILITY_NAME
LINCOLN CNTR ENV REMEDIATION TRUST
STREET_NUMBER
0
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J • <br /> 0 LFR <br /> • B-zone monitoring wells were installed on the Kawai property (MW-211B) and on Benjamin <br /> Holt near Harrisburg Place (MW-213B) from January 18 through 29, 1999, as part of the <br /> Plume Perimeter Investigation (Locations 20 and 21B, respectively, on Figure 1). <br /> • A magnetometer survey was conducted on January 19, 1999, at the site occupied by Michael's <br /> Arts and Crafts (previously owned by Safeway) in an attempt to locate a reportedly abandoned <br /> well. No objects were identified that could be associated with the former well. <br /> • Monitoring of the operation of the Phase I Interim Remedial Action (IRA) groundwater <br /> extraction and treatment system (GWETS), which includes routine sampling, automated <br /> measurement, and logging of the system flow rates and other operational parameters, continued <br /> throughout the bimonthly period. The treatment system operated continuously during the <br /> reporting quarter, except as noted below. <br /> • On November 30, 1998, a shutdown occurred when the electrical power to the treatment <br /> system fluctuated, resulting in low supplied voltage to the treatment system. System repairs <br /> and upgrades were made and the system was restarted on December 24, 1998. <br /> • On December 25, 1998, a shutdown occurred because of a voltage overload caused by a <br /> constriction on the shaft of the pump. The pump shaft was realigned, and the GWETS was <br /> restarted on December 27, 1998. <br /> • On December 30, 1998, the GWETS was off line from 10:30 to 13:10 because of a power <br /> outage. <br /> • Fluid levels in selected groundwater wells were measured for the purpose of assessing the <br /> effectiveness of groundwater extraction well capture on December 2 and 16, 1998, and on <br /> January 6, 13, and 27, 1999. <br /> • Access negotiations continued with Bank of America to obtain permission to conduct remedial <br /> investigation activities on their property located at 503 W. Benjamin Holt Drive. <br /> Data Collection and Field Activities Anticipated for February and March 1999 <br /> The following data collection and field activities are planned at the Site during the next bimonthly <br /> period, or have commenced or been completed since the end of the bimonthly period: <br /> • One B-zone monitoring well was installed on Gunton Way (MW-212B) from February 2 <br /> through 5, 1999, as part of the Plume Perimeter Investigation (Location 23 on Figure 1). <br /> • All newly installed Remedial Investigation CPT/PIPP borings and monitoring wells were <br /> surveyed on February 10, 1999. <br /> bimonthly-Feb99-041 I l.doc:blh 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.