Laserfiche WebLink
June 22, 2015 <br /> Page 2 <br /> groundwater into an area of unpolluted soil or groundwater. <br /> However, the EHD is willing to consider an amendment to the Work Plan for the <br /> utilization of the pressure grouting method in lieu of over-drilling on a well by well basis, <br /> if an analysis demonstrates this method can provide an equivalent protection of removing <br /> the threat of an actual or future conduit. To do such an analysis, EHD will need as <br /> detailed information as is available about the location of the pollutants/contaminants in <br /> the soil and groundwater in relation to each well proposed for destruction. If available <br /> data is not sufficient, then the Site geologists/engineers and EHD staff can discuss what <br /> additional information may be necessary and a reasonable timeline for obtaining such <br /> data.' <br /> Please contact Debbie Rosa] of my office to confirm the date and time of the <br /> meeting or, if necessary, to propose alternative dates and times. Thank you and I look <br /> forward to working with you. <br /> Thank you, <br /> Zoo-%? P. Verriff <br /> Zayante (Zoey) P. Merrill, <br /> Deputy County Counsel <br /> cc Linda Turkatte, Director <br /> San Joaquin County Environmental Health Department <br /> 1 If the timing of the meeting or the request for additional data creates a need for an <br /> extension on any existing destruction permits then Site geologist/engineers and <br /> EHD staff can discuss that at the proposed meeting. <br /> 2 <br />