Laserfiche WebLink
Levine-Fricke-Recon • <br /> Section:3 <br /> Date Initiated:September 23, 1996 <br /> Revision No.: 1 , <br /> Date Revised:August 21, 1998 <br /> Page 4 of 34 <br /> 3.0 GENERAL WORK DESCRIPTION <br /> Section 3 of the Rl/FS Work Plan sets forth in detail the remedial investigation ' <br /> activities that will be performed at the Site. Generally speaking, these activities ' <br /> include: <br /> • sewer line video survey , <br /> • cone penetrometer testing <br /> • groundwater sampling using push-in polyvinyl chloride piezometers methods , <br /> • groundwater sampling and collecting measurements from existing wells <br /> • drilling, using mud rotary, hollow-stem auger, and air percussion techniques ' <br /> • collecting soil-vapor samples <br /> • remedial activities, including the installation of conveyance piping, and <br /> construction and operation of treatment systems ' <br /> In addition, treatability studies (as described in Section 6 of the RDFS Work Plan) may <br /> also be performed at the Site during the RI/FS Work Plan implementation. , <br /> Page F-4 RIPSWP-AppFRevi-0411 LSRL <br /> t <br />