Laserfiche WebLink
March 10,2003 <br /> NOA Environmental Project Number:LE03-063 <br /> Page 4 <br /> Mr. Calkins attempted numerous testing and remediation regimens on the UST site in an effort to <br /> gain approval to backfill the excavation with the removed soil. He employed FGL Environmental of <br /> Stockton, Chemical Specialties of Shingle Springs, T & T Earth Services of Jackson, Park <br /> Environmental of Sacramento, and Advanced GeoEnvironrnental of Stockton in various capacities <br /> from 1991 through 1996. As of March of 1996, the excavation remained unfilled. <br /> In the summer of 1995, the excavation was backfilled with clean dirt to a depth of approximately 4 <br /> feet below surface grade(bsg). Plastic sheeting was placed above the clean soil to act as a vapor and <br /> water barrier. Hydrocarbon-impacted soil from the previously stockpiled soil was then used to fill <br /> the upper four feet. <br /> On May 14, 1996, five soil borings were advanced by Soil Explorations Services, Inc. of Rancho <br /> t. Cordova. Four borings were advanced to 3 5 feet and one to 25 feet. Samples were collected at five- <br /> foot intervals. The samples selected for analysis yielded non-detect results for total petroleum <br /> + hydrocarbons as diesel and for benzene, toluene, ethyl benzene, and xylenes. <br /> r~. <br /> PHS issued a"no further action"letter to Mr. Calkins on January 16, 1997. The letter stated that, <br /> "based on the information in the above-referenced file and with the provision that the information <br /> L- provided to this agency was accurate and representative of site conditions, no further action related <br /> to the underground tank release is required." <br /> No information from beyond 1997 was provided to our office by Mr. Stephens. <br /> II. DESCRIPTION OF TOPOGRAPHY AND SURFACE FEATURES, I.E. <br /> WATERCOURSES, LAKES,AND GROUNDWATER RECHARGE FACILITIES <br /> Table I provides a summary of the physical setting of the site and vicinity. <br /> Table I ; Physical Setting Summa <br /> Topographic Map: U.S. Geological Survey,7.5 minute Lodi North, California,topographic <br /> quadrangle map,dated 1968,photorevised 1976 <br /> Topographic Map Southeast quadrant of southeast quadrant of Section 25,Township 4 North,Range <br /> Location: 6 East,Mount Diablo Base and Meridian <br /> r, Topography: Relatively level at an elevation of 50 to 60 feet;a small pond is present along the <br /> western boundary <br /> General Location: Directly north of the Highway 99 West Frontage Road at Woodbridge Road, <br /> 16d Acampo <br /> Assessor's Parcel 013-210-51 <br /> Number: <br /> Geologic unit: Great Valley Province,upper Modesto Formation <br /> 1.. <br />