My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_2001-CURRENT
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
5400
>
2900 - Site Mitigation Program
>
PR0522692
>
SITE INFORMATION AND CORRESPONDENCE_2001-CURRENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2020 3:01:51 PM
Creation date
4/2/2020 2:25:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
2001-CURRENT
RECORD_ID
PR0522692
PE
2957
FACILITY_ID
FA0015465
FACILITY_NAME
FORMER MONTGOMERY WARDS AUTO SRV CTR
STREET_NUMBER
5400
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10227008
CURRENT_STATUS
01
SITE_LOCATION
5400 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
701
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
08/01/01 15:03 FAX 209 942 00 Siegfried Eng • I�J010 <br /> 3.05 DUST CONTROL <br /> A. In areas where excessive dust,caused by construction operations, is a nuisance to property <br /> Colleges, the Contractor shall frequently wet down the area to control the dust in accordance <br /> with the Contract Documents. <br /> 3.06 FINAL CLEANING <br /> A. Upon completion of all work all paved areas shall be swept to remove all dirt, gravel, or other <br /> debris. Flushing of streets will not be permitted.All access roads, haul roads, and the areas <br /> surrounding the borrow areas and project site shall be returned to their condition existing prior <br /> to commencement of work. <br /> As a condition of final acceptance of the work,the Contractor shall carefully cleanup the work <br /> and the premises, remove all temporary structures built by or for him, remove all surplus <br /> construction materials, debris, and rubbish of all kinds from the grounds,which he has <br /> occupied, and leave them in a neat condition. The entire project shall be left in a condition that <br /> will present a pleasing appearance as viewed in general and in a manner satisfactory to the <br /> Engineer. <br /> The Engineer shall perform a final inspection of the clean up of the site, and the Contractor <br /> shall remedy such problems noted during the inspection, or provide such additional work as <br /> deemed appropriate, at no additional cost to the College. <br /> END OF SECTION <br /> R 01-8 <br /> 01561 -2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.