Laserfiche WebLink
scheduled: replacement well ( -15R) for 5606/5400 Pacific Avenue ckton Page 2 of 2 <br /> r <br /> -proof(access agreement)from the current land owner that you/we are allowed on the property to do this job. <br /> Our records indicate that ENSR is listed as the entity to receive SJCEHD billing for work associated with this site. <br /> Please verify that Robert L'Heureux, 10641 Old Placerville Rd, Suit 170, Sacramento, 95827 is still the correct <br /> contact name and address to receive the billing. If not ENSR, then additional forms and fees will be required <br /> before the permit application can be processed. <br /> attached for your convienence is the SJCEHD webpage for the 2-paged permit application you will need to <br /> complete and return. Please note that if the C-57 driller does not sign page one of the permit and an ENSR <br /> employee signs it, the California C-57 contractor MUST sign a letter of authorization for that ENSR employee. <br /> The bottom of page 2 of the permit(the LCD)offers a section for this purpose if the C-57 does not wish to <br /> generate a formal letter. <br /> Payments for the application fee can be check, cash or by VISA electronically. See our website HOME page for <br /> information to utilize the electronic fee option. <br /> If you like, I will notify you when I receive your submittals and provide an estimate of the date of issue or if there is <br /> a problem with the papers. <br /> Michael Infurna <br /> SJCEHD <br /> (209)468-3454 <br /> http://www.sigov.org/ehd/docs/pdf/WELL-PERMIT-APPL pdf <br /> From: Johnston, Jennifer [mailto:]Johnston@ensr.aecom.com] <br /> Sent: Thursday, October 18, 2007 3:31 PM <br /> To: Mike Infurna (EH] <br /> Cc: Jim Barton; Siegel, Eric <br /> Subject: scheduled: replacement well (MW-15R) for 5606/5400 Pacific Avenue, Stockton <br /> Mike: <br /> ENSR's work plan entitled Work Plan for Replacement of Decommissioned Monitoring Well 15(August 30, <br /> 2007)was conditionally approved by the Central Valley Water Board (CVWB) in a letter dated October 4, <br /> 2007 by Mr. Jim Barton. As requested by the CVWB, additional information will be provided in an <br /> addendum to the work plan,which will be submitted by tomorrow. ENSR is anticipating the CVWB's <br /> written approval of the addendum and is preparing for well installation activities. <br /> I wanted to notify you that ENSR has scheduled Woodward Drilling for Wednesday, October 31, 2007 to <br /> install MW-15R for the former Unocal/Wards site in Stockton. The well permit application will be <br /> forthcoming. The ENSR geologist and point of contact for the drilling activities is Eric Siegel; Eric can be <br /> reached at(916)288-4429 or esiegel@ensr.aecom.com. Let me know if you have any questions. <br /> Jennifer Johnston <br /> Project Manager <br /> D 916.288.4312 <br /> ENSR <br /> 10461 Old Placerville Road, Suite 170 <br /> Sacramento, CA 95827-2508 <br /> T 916.362.7100 F 916.362.8100 <br /> E jjohnston@ensr.aecom.com <br /> www.ensr.aecom.com <br /> 10/19/2007 <br />