EQUIPMENT SCHEDULE 208 HCD
<br />MARK
<br />MAKE
<br />MODEL
<br />BESC,
<br />CAPACITIES
<br />AMB
<br />102
<br />ELECTRICAL
<br />ITEM QTY VOLT
<br />PH
<br />ACCESSORIES
<br />CFM
<br />HEAT
<br />COOLING
<br />RTU -1
<br />950
<br />MAU-1
<br />2880
<br />IN/OUT
<br />T❑T/SENS
<br />12"x6" SUPPLY DIFFUSER WITH 6" ROUNDNECK OBD,
<br />LINED DUCT WITH INSULATION
<br />ADJUSTABLE 1 -WAY THROW EQUAL TO TITUS MODEL 350RL
<br />RTU -1
<br />CARRIER
<br />PACKAGE
<br />3000
<br />125
<br />89.0
<br />85
<br />FLA 33.7 2087
<br />W/ ECONOMIZER
<br />7.5 TON
<br />48HCD08
<br />GAS
<br />0.5"
<br />103
<br />72.9
<br />65
<br />3PH
<br />HIGH STATIC MOTOR
<br />4. PROVIDE BALANCING DAMPERS AT BRANCH TAP.
<br />383D
<br />ELECTRIC
<br />TOTAL EXHAUST AIR: -3675
<br />AFUE
<br />12 EER
<br />MD DM
<br />MCA 49.3, MOCP
<br />ROOF CURB WT=1 100#
<br />EF -1 EF -2 EF -3
<br />IF
<br />MAU-1
<br />RTU -1
<br />82%
<br />13.8 IEER
<br />M.U.A. E.A. E.A. E.A.
<br />60
<br />KITCHEN AREA
<br />NOTES:
<br />1. NEW ROOFTOP UNITS SHALL BE CARRIER 48HC HIGH EFFICIENCY MODELS IN GAS HEATING AND ELECTRIC
<br />COOLING WITH THE FOLLOWING ACCESSORIES:
<br />A. 14" HIGH STANDARD FLAT ROOF CURBS SHALL BE FACTORY SUPPLIED AND FIELD INSTALLED BY
<br />MECHANICAL CONTRACTOR UNLESS SPECIFIED OTHERWISE BY THE MECHANICAL ENGINEER.
<br />B. INTEGRATED ECONOMIZER WITH RELIEF FAN SHALL BE FACTORY PROVIDED AND FIELD INSTALLED BY
<br />MECHANICAL CONTRACTOR.
<br />C. SUPPLY AND RETURN AIR SMOKE DETECTORS SHALL BE FACTORY PROVIDED, INSTALLED AND WIRED.
<br />D. VERIFY INDOOR BLOWER (EVAPORATOR FAN) MOTOR AND DRIVE REQUIREMENTS FOR EACH UNIT PER
<br />CFM/STATIC PRESSURE REQUIREMENTS SHOWN ON SCHEDULE.
<br />E. PROVIDE AN ECONOMIZER FAULT DETECTION AND DIAGNOSTICS AS REQUIRED BY CEC.
<br />SYSTEM AIR BALANCE SCHEDULE
<br />DESIGNATION
<br />EXHAUST
<br />CFM
<br />OUTSIDE AIR
<br />CFM
<br />MAKE-UP AIR
<br />CFM
<br />EF -1
<br />1000
<br />RTU -1
<br />950
<br />MAU-1
<br />2880
<br />EF -2
<br />2600
<br />12"x6" SUPPLY DIFFUSER WITH 6" ROUNDNECK OBD,
<br />LINED DUCT WITH INSULATION
<br />ADJUSTABLE 1 -WAY THROW EQUAL TO TITUS MODEL 350RL
<br />6"N
<br />EF -3
<br />75
<br />ABOVE FINISHED FLOOR
<br />AFF
<br />g"N
<br />151 - 200 CFM
<br />TOTAL EXHAUST AIR:
<br />3675
<br />TOTAL OUTSIDE AIR:
<br />950
<br />TOTAL MAKE-UP AIR:
<br />2880
<br />SYSTEM BALANCE:
<br />2. ALL GRILLES IN RESTROOMS TO BE ALUMINUM. ALL OTHERS STEEL UNLESS
<br />TOTAL OUTSIDE AIR: 950
<br />3. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATION AND
<br />TOTAL MAKE-UP AIR: 2880
<br />4. PROVIDE BALANCING DAMPERS AT BRANCH TAP.
<br />383D
<br />CSFD - CEIL. FIRE SMOKE DAMPER
<br />TOTAL EXHAUST AIR: -3675
<br />5 AD -1 DRIVE THRU WINDOW READY ACCESS AA300-275 NA NA 9153
<br />PRESSURIZATION: +155
<br />MD DM
<br />2880 M.U.A.
<br />950 O.A.
<br />EF -1 EF -2 EF -3
<br />IF
<br />MAU-1
<br />RTU -1
<br />2880 1000 2600 75
<br />3000 2050
<br />M.U.A. E.A. E.A. E.A.
<br />S.A. R.A.
<br />KITCHEN AREA
<br />LOCATION: FLOOR
<br />WALL
<br />AIR BALANCE DIAGRAM
<br />RTU -1 ROOFTOP UNIT TO BE INTERLOCKED WITH
<br />EF -1 & EF -2.
<br />THIS WILL ENSURE POSITIVE BUILDING PRESSURE
<br />AND BALANCE.
<br />WHEN EF -1 & 2 ARE ENERGIZED RTU --1 FAN SHALL COME ON.
<br />SPACE TEMPERATURE WILL BE MAINTAINED FROM
<br />THERMOSTAT SET POINT.
<br />DUCT SENSORS SHALL CYCLE HEAT TO ACHIEVE
<br />65 DEGREE OUTSIDE AIR.
<br />AIR DEVICE SCHEDULE
<br />DESIGNATION
<br />DESCRIPTION
<br />Sc
<br />24x24" SUPPLY DIFFUSER WITH ROUNDNECK 24"x24"
<br />ITEM
<br />4 -WAY THROW EQUAL TO TITUS MODEL PAS.
<br />12" DIA.
<br />401- 600
<br />=
<br />1/2
<br />SA
<br />12"02" SUPPLY DIFFUSER WITH 8" ROUNDNECK OBD,
<br />NET INSIDE DIMENSIONS
<br />ADJUSTABLE 1 -WAY THROW EQUAL TO TITUS MODEL 350RL
<br />-
<br />12"x6" SUPPLY DIFFUSER WITH 6" ROUNDNECK OBD,
<br />LINED DUCT WITH INSULATION
<br />ADJUSTABLE 1 -WAY THROW EQUAL TO TITUS MODEL 350RL
<br />6"N
<br />50 - 150 CFM
<br />SEE DRAWING FOR THICKNESS
<br />ABOVE FINISHED FLOOR
<br />AFF
<br />g"N
<br />151 - 200 CFM
<br />- - - - -
<br />RE
<br />24"x24" RETURN GRILLE EQUAL TO TITUS
<br />1 115 DIRECT CABINET 10
<br />MODEL 350R
<br />NOTES:
<br />1. OBD -OPPOSED BLADE DAMPER (REQUIRED AT GYP. CEILINGS).
<br />2. ALL GRILLES IN RESTROOMS TO BE ALUMINUM. ALL OTHERS STEEL UNLESS
<br />NOTED OTHERWISE.
<br />3. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATION AND
<br />ELEVATION OF DEVICES.
<br />4. PROVIDE BALANCING DAMPERS AT BRANCH TAP.
<br />FLEX DUCT TO MAIN RUN TO BE
<br />MIN 3'2' LENGTH S❑ THAT THE
<br />DUCT SIZE AND INSULATION
<br />VALUE IS SHOWN ON ALL DUCTS
<br />AND MAX LENGTH TO BE 10'0' FOR
<br />OSHPD AND 5'0' FOR ALL OTHERS.
<br />12' GI DUCT EXTENSION
<br />ABOVE CEILING
<br />INSULATION, FLEX
<br />DUCT TO MAIN RUN
<br />24 GAUGE GI REGISTER
<br />CAN
<br />SCREW CAN TO
<br />BLOCKING - 4 TOTAL
<br />L -REGISTER - SEE PLAN
<br />FOR SIZES - PR❑VIDE
<br />1/2' SOUND LINER IN
<br />CEILING REG DETAIL REGISTER CAN
<br />DETAIL
<br />EXHAUST FAN INFORMATION
<br />FAN
<br />SYMBOL LEGEND
<br />JOB NO.:
<br />SYMBOL
<br />BYPASS, NITESTAT, CLOCK
<br />ITEM
<br />ABBREV.
<br />UNIT TAG SERVES MANUFACTURER FAN UNIT CFM ESP. RPM H.P.
<br />N0. MODEL #
<br />VOLT DRIVE TYPE WEIGHT (BS.)
<br />RECTANGULAR DUCT SIZE
<br />1/2
<br />1 115 DIRECT ROOF 71
<br />-
<br />NET INSIDE DIMENSIONS
<br />WO/
<br />-
<br />10.7
<br />LINED DUCT WITH INSULATION
<br />2 EF -2 GRILL HOOD CAPTIVEAIRE DU85HFA 2600 0.85 1192
<br />3/4
<br />1 115 DIRECT ROOF 71
<br />SEE DRAWING FOR THICKNESS
<br />ABOVE FINISHED FLOOR
<br />AFF
<br />FLEXIBLE SUPPLY DUCT, CLASS 1
<br />18.4
<br />- - - - -
<br />FLEXIBLE RETURN DUCT, CLASS 1
<br />1/4
<br />1 115 DIRECT CABINET 10
<br />VD -VOLUME DAMPER, REQUIRED
<br />NONE
<br />5D
<br />FD - FIRE DAMPER
<br />FDR
<br />VD
<br />FSD FIRE SMOKE DAMPER
<br />FSD
<br />TBR
<br />CSFD - CEIL. FIRE SMOKE DAMPER
<br />CSFD
<br />5 AD -1 DRIVE THRU WINDOW READY ACCESS AA300-275 NA NA 9153
<br />MD DM - MOTORIZED DAMPER
<br />MD DM
<br />NA 5H,7
<br />DUCTWORK - GI SPIRAL PIPE
<br />CUT OFF POINT
<br />IF
<br />TURNING VANES
<br />TV
<br />300
<br />-
<br />FIRST LETTER CEILING
<br />CS -4
<br />12x12
<br />-
<br />LOCATION: FLOOR
<br />WALL
<br />UON
<br />CS -4
<br />SECOND LETTE
<br />SUPPLY
<br />SERVICE:
<br />C. OF
<br />HWS -
<br />4. ALL FAN MOTORS TO BE TEFC.
<br />RETURN
<br />Fz]
<br />I
<br />NUMBER -TYPE: EXHAUST
<br />-
<br />MACHINE BOLT
<br />SEE SCHED.
<br />6. PROVIDE MINIMUM 14" HIGH FACTORY INSULATED CURB ON ALL ROOF EXHAUST FANS EXCEPT GREASE
<br />7. PROVIDE FAN SPEED CONTROLLER ON ALL DIRECT -DRIVE FANS.
<br />EXHAUST FAN INFORMATION
<br />FAN
<br />THERMOSTAT, UNIT NO.
<br />JOB NO.:
<br />© ❑N ©
<br />BYPASS, NITESTAT, CLOCK
<br />SONES
<br />NOTES
<br />UNIT TAG SERVES MANUFACTURER FAN UNIT CFM ESP. RPM H.P.
<br />N0. MODEL #
<br />VOLT DRIVE TYPE WEIGHT (BS.)
<br />1 EF -1 FRYER HOOD CAPTIVEAIRE DU50HFA x,`1000. 0.75 1229
<br />1/2
<br />1 115 DIRECT ROOF 71
<br />-
<br />WITH OUT
<br />WO/
<br />-
<br />10.7
<br />1,4,5A
<br />2 EF -2 GRILL HOOD CAPTIVEAIRE DU85HFA 2600 0.85 1192
<br />3/4
<br />1 115 DIRECT ROOF 71
<br />-
<br />ABOVE FINISHED FLOOR
<br />AFF
<br />1
<br />18.4
<br />1,4,5A
<br />3 EF -3 RESTROOM GREENHECK SP -B110 75""'0.25 1234
<br />1/4
<br />1 115 DIRECT CABINET 10
<br />-
<br />2.0
<br />5D
<br />4 MUA-1 FRYER/GRILL HOOD CAPTIVEAIRE A2 -G12 2880 0,65 1212
<br />1
<br />1 115 DIRECT ROOF 331
<br />-X-X->(-
<br />DEMOLITION TO BE REMOVED
<br />TBR
<br />18.7
<br />2,3
<br />5 AD -1 DRIVE THRU WINDOW READY ACCESS AA300-275 NA NA 9153
<br />NA
<br />1 208 DIRECT WINDOW 85
<br />NA 5H,7
<br />GENERAL NOTES: APPLICABLE TO ALL FANS
<br />CUT OFF POINT
<br />COP
<br />-
<br />1. REFERENCE ELECTRICAL DRAWINGS FOR ELECTRICAL DATA.
<br />FBO
<br />-
<br />UP THROUGH ROOF
<br />2. REFERENCE FLOOR PLANS FOR EXACT LOCATION
<br />-
<br />UNLESS OTHERWISE NOTED
<br />UON
<br />3. REFERENCE ARCHITECTURAL DRAWINGS FOR ROOF CURB DETAIL.
<br />CONDENSATE, OVERFLOW
<br />C. OF
<br />HWS -
<br />4. ALL FAN MOTORS TO BE TEFC.
<br />HWS,HWR
<br />- CHWS
<br />I
<br />5. PROVIDE DISCONNECT SWITCH, ON ALL ABOVE CEILING CABINET FANS.
<br />-
<br />MACHINE BOLT
<br />MB
<br />6. PROVIDE MINIMUM 14" HIGH FACTORY INSULATED CURB ON ALL ROOF EXHAUST FANS EXCEPT GREASE
<br />7. PROVIDE FAN SPEED CONTROLLER ON ALL DIRECT -DRIVE FANS.
<br />FAN.
<br />G, LPG
<br />SPECIFIC NOTES:
<br />ALL THREAD ROD
<br />ATR
<br />- -
<br />1. PROVIDE 24" HIGH GREASE CURB AS REQUIRED BY CODE. VENTED EXTENSION, GREASE
<br />2. INTERLOCK KITCHEN SUPPLY FANS WITH KITCHEN EXHAUST FANS.
<br />TROUGH,
<br />HINGED BASE ON GREASE EXHAUST FAN.
<br />FEET PER MINUTE
<br />3. PROVIDE MAU-1 WITH INTEGRAL BACKDRAFT DAMPER AND BIRD SCREEN.
<br />D_
<br />DUCT TEMPERATURE SENSOR
<br />DTS
<br />4. PROVIDE FANS WITH MOTORS OUT OF AIR STREAM WITH DRIP --PROOF COVERS AND HOUSINGS WITH CORROSIVE RESISTANT COATING ON ALL K
<br />PLANS,
<br />T'CHEN HOOD
<br />5. PROVIDE SWITCHING AS INDICATED BELOW AND IN ACCORDNACE WITH SEQUENCE OF OPERATION.
<br />TRADES TO PROVIDE SWITCHING.
<br />CONTRACTOR SHALL COORDINATE THE WORK
<br />OF ALL
<br />5A SWITCH FAN FROM KITCHEN HOOD SWITCH.
<br />-
<br />STEAM PIPE
<br />S
<br />56 INTERLOCK SUPPLY FAN WITH RESPECTIVE KITCHEN HOOD EXHAUST FAN
<br />STEAM CONDENSATE
<br />Sc
<br />-
<br />5C SWITCH EXHAUST FANS WITH LIGHTS, PROVIDE 15 MIN TIME DELAY RELAY.
<br />CW
<br />>Q
<br />SHUT OFF/BALL VALVE
<br />5D SWITCH EXHAUST FANS WITH LIGHTS, PROVIDE 30 MIN TIME DELAY RELAY.
<br />-
<br />DUCT SMOKE DETECTOR
<br />DSD
<br />5E PROVIDE LOCAL TEMERPATURE SENSOR ON-OFF CONTROL.
<br />5F SHALL OPERATE 24/7, WIRE ALL FANS TO SINGLE LABLED SWITCH AT STAFF STATION PER SMOKE COMPARTMENT.
<br />COORDINATE WITH ELECTRICAL CONTRACTOR
<br />5G INTERLOCK TO TIMECLOCK, ENERGIZE DURING HOURS OF OPERATION.
<br />5H INTERLOCK WITH DRIVE THRU DOOR.
<br />6. CABINET FANS SHALL HAVE CEILING RADIATION DAMPERS AT EXHAUST. EHXUAST DUCT
<br />FLASH PER ROOFING CONTRACTOR SPECIFICATIONS.
<br />SHALL GO
<br />UP THROUGH ROOF TO TURN DOWN, SIZ
<br />PER PLANS,
<br />7. 7.1 KW HEAT, 32 A, 600 FPM DISCHARGE AIR VELOCITY.
<br />^1 i
<br />12x12 - GRILLE NECK SIZE IN INCHES HVAC Notes1. Furnish and install alt ductwork in accordance with the latest editions of CMC (SMACNA duct construction standards),
<br />PROVIDE VD'S LL ALL D RE AND TAPS 2. All Pipes, ductwork and conduit shall be installed and seismical) braced per SMACNA's
<br />SUPPLYING GRILLES AND REGISTERS FOR p p y p Seismic Restraint Guidelines, ❑SHPD pre- pproval #80010,
<br />CE -1 AIR BALANCING PER T--24, 3. All contractor furnished equipment installation and startup instructions shall be kept with the piece of equipment in weather proof pouches until
<br />final inspection. After final inspection, three sets of operation, installation, maintenance and start-up instructions shall be given to the Owner
<br />for each piece of equipment per the Ca Green Building Code.
<br />4. All Fire and Fire Smoke Damper installation instructions shall be made available to the inspecting authority for their review,
<br />5. All penetrations through fire rated assemblies shall be fire stopped and sealed with a material that meets or exceeds the rating of the
<br />assembly penetrated, Materials to be used for sealing shall be coordinated with the General Contractor to provide one bra 'd onsite.
<br />6, Install all pipe and duct insulation materials per T-24 requirements, All material to be Installed shall meet CBC flame and smoke requirements per
<br />note 11,
<br />7. All work on this project shall conform to the following codes:
<br />2016 CBC
<br />2016 CPC
<br />2016 CMC
<br />8016 CEC
<br />8016 CALIFORNIA GREEN BUILDING CODE,
<br />8. All wye branches connected to a diffuser, grille or register shall have a manual volume damper installed in the wye branch. KBD's shall only be
<br />used when wye branches will be installed over inaccessible ceiling areas or in the slab of the building, Dampers shall be fabricated of the same
<br />gauge as the duct with 1' standoff, locking quadrant, and handle, Fasten red ribbon to handle to mark location,
<br />9. All gas pipe to be schedule 40 with screwed fittings. All air conditioning/refrigeration condensate drain lines shall be schedu e 40 PVC run to
<br />the an approved receptor. Set pipe on redwood blocks with 24 ga GI cover unless otherwise shown differently on drawings.
<br />10. Provide smoke detectors in the supply air duct on all units when the aggregate cfm exceeds 2000 cfm of all equipment serve g a room or more
<br />than one room and the room has no direct exits to the exterior. Duct smoke detectors shall be installed after the supply ;fan before any
<br />branch takeoffs. When more than one unit serves a TI space and the aggregate cfm of the units serving the TI space exceeds 2000 cfm, all
<br />HVAC equipment shall have duct smoke detectors. All duct smoke detectors shall be wired to shut down all units when a sin le unit alarms.
<br />11 All exposed ductwork shall be GI pipe and fittings. Line all rectangular duct with Insulation with the R-vlaue listed In T-24 f r the location of
<br />the duct (attic, conditioned or Outside), All duct materials from insulation to mastics Including but not limited to sheet metal,::insulation, liners,
<br />plastics, rubber cements, latex, etc, shall be made of materials with a Flame spread <=25 and smoke <=50.
<br />12. It is the responsibility of the Mechanical Contractor to coordinate 'the installation of his work including equipment substitute ns with the other
<br />trades including but no limited to electrical, fire sprinkler, framing and plumbing.
<br />13. Insulate all ductwork per the T-24 energy requirements found In the T -E4 compliance report, All ductwork shall be tested f6r leaks with a
<br />maximum static pressure in the duct of 1,01, maximum leakage shall not exceed 4% of the total supply and return air volumes.
<br />14. Contractor shall label all equipment with unique identification using plastic engraved plates with 1/8' tall lettering indicating t e equipment number
<br />and state the areas served by the equipment, See specifications on dwgs,
<br />15, All flex duct will be stretched as tight as possible and as per manufacturers listing to avoid all kinks and sagging,
<br />16. AU smoke detectors shall be tested as required with an approved smoke system per the City of Stockton's standards in th. presence of the
<br />inspector or fire Marshall.
<br />17. All systems shall require an air balance report upon final inspection. Submit reports on NESS or NABC forms an independent certified alir
<br />balance showing system has been balanced and OSA quantities set to that shown on drawings.
<br />18. Condensate drain lines installed in direct or indirect sunlight shall be UV resistant CPVC or PVC pipe and shall be painted to ;protect from UV
<br />radiation.
<br />19. Seal all joints and seams with DP -1010 duct sealer,
<br />T-24 MECH AND PLUMBING MANDATORY FEATURES
<br />1. EQUIPMENT SHALL BE CERTIFIED TO MINIMUM EFFICIENCY PER SECTI❑N 1102 - SEE SCHEDULES ON M-0.
<br />2. HVAC CONTROLS AND EQUIPMENT CERTIFIED PER SECTION 120.2 FOR THERMOSTATS AND DDC CONTROLS - SEE DETAILS ON MO.
<br />3, SERVICE WATER HEATING SHALL COMPLY WITH SECTION 110,3 ,
<br />4. USE OF PILOT LIGHTS ON HVAC, GAS COOKING POOL AND SPA HEATERS PROHIBITED PER SECTION 110.5
<br />5. LAVATORIES SHALL BE SET TO MAINTAIN DISCHARGE TEMP AT 1109F ❑R LESS PER SECTION 1103 - SEE PLUMBING SCHEDULE
<br />6. VENTILATION REQUIREMENTS PER 1201b,c&d M-1 AIR BALANCE
<br />7. NATURAL VENTILATI❑N PER 180.1.1o,1 N/A
<br />8. CONTROLS SHALL MEET REQUIREMENTS PER 122, SEE M-0 AND NOTES,
<br />9. SHUT DOWN AND BACKDRAFT DAMPERS PER 128.f See schedules on M-0
<br />10, ISOLATION AREA DEVICES PER 122,g N/A
<br />11. PIPE INSULATION PER 120.3,g SEE NOTES, TABLE 1203--A
<br />12. REQUIREMENTS FOR DUCTS AND PLENUMS PER 124 SEE M-0, NOTES AND SPECIFICATIONS
<br />13. MECHANICAL ACCEPTANCE TEST FORMS SUBMITTED AT END OF PROJECT PER SECTION 1805, 180.7 AND 120.8 - SEE T24 DRAWINGS FOR F0R2MS REQUIRIED (1-17)
<br />TO BE SUBMITTED AT THE END OF THE PROJECT FOR EACH HVAC AND PLUMBING SYSTEM, AND FOR EACH HVAC AND PLUMBING PIECE OFQUIPMENT.
<br />O
<br />THERMOSTAT, UNIT NO.
<br />JOB NO.:
<br />© ❑N ©
<br />BYPASS, NITESTAT, CLOCK
<br />-
<br />CHECKED:
<br />ABBREVIATIONS W/OR WO SYMBOLS
<br />SHEET
<br />-
<br />WITH
<br />W/
<br />-
<br />WITH OUT
<br />WO/
<br />-
<br />DOWN
<br />ON
<br />--
<br />GALVANIZED SHEET METAL
<br />G!
<br />-
<br />ABOVE FINISHED FLOOR
<br />AFF
<br />-
<br />BELOW FINISHED FLOOR
<br />BFF
<br />-
<br />BELOW FINISHED CEILING
<br />BFC
<br />-
<br />ABOVE FINSHED CEILING
<br />AFC
<br />-
<br />NEW DUCTWORK
<br />-
<br />-X-X->(-
<br />DEMOLITION TO BE REMOVED
<br />TBR
<br />DUCTWORK EXISTING
<br />(E)
<br />Z
<br />POINT OF CONNECTION
<br />POC
<br />CUT OFF POINT
<br />COP
<br />-
<br />FURNISHED BY OTHERS
<br />FBO
<br />-
<br />UP THROUGH ROOF
<br />UTR
<br />-
<br />UNLESS OTHERWISE NOTED
<br />UON
<br />C
<br />CONDENSATE, OVERFLOW
<br />C. OF
<br />HWS -
<br />HEATING WATER SUPPLY, RETURN
<br />HWS,HWR
<br />- CHWS
<br />CHILLED WATER SUPPLY, RETURN
<br />CHWS,CHWR
<br />-
<br />MACHINE BOLT
<br />MB
<br />G,LPG
<br />NATURAL GAS, LPG LINE
<br />G, LPG
<br />----
<br />ALL THREAD ROD
<br />ATR
<br />- -
<br />OUTSIDE AIR
<br />OSA
<br />-
<br />FEET PER MINUTE
<br />FPM
<br />D_
<br />DUCT TEMPERATURE SENSOR
<br />DTS
<br />-
<br />FLEXIBLE DUCT CONNECTOR
<br />FC
<br />-
<br />FLEX DUCT
<br />-
<br />-
<br />STEAM PIPE
<br />S
<br />-
<br />STEAM CONDENSATE
<br />Sc
<br />-
<br />MAKEUP WATER
<br />CW
<br />>Q
<br />SHUT OFF/BALL VALVE
<br />BV
<br />-
<br />DUCT SMOKE DETECTOR
<br />DSD
<br />INVERTED P -TRAP
<br />W/INSECT SCREEN O
<br />INLET
<br />COUNTERFLASHING W/
<br />SS DRAWBAND, SEAL AROUND
<br />FLASHING AND PIPE W/SIKAFLEX
<br />V CLEAR SPACE
<br />BETWEEN JACK AND
<br />FLUE/DUCT
<br />FINISH ROOFING - ROLL
<br />UP JACK AND ATTACH
<br />UNDER C❑UNTERFLASHING 1
<br />ROOF JACK - 24 GA 1
<br />NAIL TO ROOF W/ MIN
<br />4-2'10d NAILS
<br />SEE STRUCT DWG_
<br />FOR TRUSSES
<br />2x BLOCKING BY G --
<br />FLUE OR ROUND
<br />EXH. DUCT
<br />4-12"0 PVC COMB AIR/FLUE THRU ROOF
<br />DETAI L
<br />208v 30
<br />W/GR❑UND
<br />FUSED DISC BY
<br />ELECTRICAL
<br />CONTRACTOR
<br />120V 10
<br />W/GR❑UND
<br />WIRE
<br />LINE ECON LOGIC
<br />_ NIT BOARD SUPPLIED EO USE M URBACTUREWS
<br />RC RH G Yl Y2 W1 W2 C A FRMR I MANUFACTURER'S ROOF CURB
<br />24 I 14' MEN Hi, IS MW CONST
<br />RUCTI
<br />C
<br />ATTACH 18 GA VENTILATED ROOF
<br />CURB TO FAN BASE W/3#10x1'
<br />SM SCREWS 2 EA SIDE OF FAN BAS
<br />16 GA VENTILATED ROOF CU
<br />ATTACH VENTILATED
<br />DSD. SD CURB TO 18 GA ROOF CUR
<br />OW/3#10x1' SM SCREWS
<br />AIR PRODUCTS SL 2O 2 EA SIBE OF CURB BASE
<br />RC RH G Yl Y2 W1 W2 C 26 GA GI
<br />PHOTELECTRIC SMOKE COUNTERFLASHI i
<br />DETECTOR FILL VOID SPACE W/
<br />HONEYWELL VISI❑NPRO 8000 WITH NC RIDGID INSULATION
<br />AUTOMATED DEMAND RESPONSE FINISH ROOFING UP CURB AND ATT - ATTACH
<br />ROLL
<br />FUNCTION SERIES Y AND W NAILER
<br />TERMINALS TO MATCH UNITS 3/13'0x3-1/2' LAG BOLT - EMBED
<br />FIREX REMOTE 3' MIM, PLACE 48'OC
<br />TEST SWITCH SEE STRUCT DWqS
<br />AND LED'S GRN LED d FOR TRUSSES
<br />OHONEYWELL C7232C10DA RED LED O 4x BLOCKING BY
<br />WORN/STROBE o ® I -HR SHEET ROCK (SR)SHAFT
<br />C02 SENSOR, WALL RESET O SEE ARCH DWGS
<br />RC 0 IOVDC MOUNTED WITH 24 AIR PRODUCTS IS GA GREASE TIGHT, D
<br />POWER MS-RH/KA/P/AT AIRGAP TO INSIDE SR
<br />6 THERMOSTAT 5 FAN CURB MOUNT
<br />MQ DETAIL MO DETAIL
<br />0
<br />m
<br />AC -
<br />ATTACH 6' MINERAL WOOL
<br />SOUND BLANKETS TO BOTTOM
<br />OF UNIT TO DEADEN SOUND
<br />GASKET - USE MANUFACTURER'S
<br />SUPPLIED WITH CURB
<br />MANUFACTURER'S ROOF CURB
<br />14' MIN HT, 18 MIN CONSTRUCTION
<br />12 GA ANGLE CLIP - ATTACH
<br />TO CURB W/3#10x1' SM SCREWS
<br />TO UNIT W/#10x1' SM SCREWS
<br />CLIP TO B£ 6'MIN LONG, 2 £A
<br />LONG SIDE OF UNIT AT CORNERS
<br />26 GA GI
<br />COUNTERFLASHING
<br />FILL CURB VOID SPACE
<br />W/ RIGID INSULATION
<br />AND UNDER UNIT WITH
<br />ROCK WOOL BATT
<br />INSULATION
<br />FINISH ROOFING - ROLL
<br />UP CURB AND ATTACH T9 __
<br />NAILER
<br />3/8'0x3-1/2' LAG BOLT - EMBED
<br />3' MIN, PLACE 48'OC
<br />SEE STRUCT DWGS
<br />FOR TRUSSES
<br />4x BLOCKING BY GC SEAL AIRTIGH
<br />SHEET METAL DUCT
<br />W/1' 6.2R LINER
<br />AC_
<br />D ETAI L
<br />RB MOUNT
<br />DUCT OPENING
<br />F --3-16d NAILS
<br />DUCT ON ROOF -SEE
<br />SPECIFICATIONS FOR INSULATION-- --
<br />GASKET - 1/4' NEOPRENE
<br />18 GA WELDED CURB W/2x NAILER
<br />14' MIN HT, PITCH TO MATCH R❑QFC
<br />ATTACH TO CURB W/4#10x1' \
<br />SM SCREWS 1 EA
<br />LONG SIDE OF UNIT AT CORNERS
<br />2x WOOD NAILER
<br />26 GA GI
<br />C❑UNTERFLASHING
<br />FILL VOID SPACE W/
<br />RIGID INSULATI❑N
<br />FINISH ROOFING - ROLL
<br />UP CURB AND ATTACH
<br />NAILER
<br />CANT STRIP BY R❑OFEF�
<br />1/4'Ox3-1/2' LAG BOLT - EMBED
<br />3' MIN, PLACE 2 EA SIDE
<br />(E)2x6 FRAMING
<br />3-16d NAILS
<br />2x BLOCKING BY
<br />SHEET METAL DUCT W/ SEAL AIRT
<br />INSULATION THRU ROOF -
<br />DUCT CURB MOUNT
<br />EIAIL
<br />NECK SI
<br />ED
<br />CR -1 R6 PLENUM
<br />4-#12GA CEILING WIRES TO
<br />SUPPORT 1' THICK DUCT BOARD
<br />ELBOW AND REGISTER. ATTACH
<br />REGISTER TO T -BAR W/(2)
<br />#7x1/2' S/M SCREWS THRU
<br />OUTLET FLANGE TO GRID RUNNER
<br />ON ❑PPOSIT€ CORNER
<br />N
<br />N
<br />2'x24 GA GI DUCT SUPPORT STRAP
<br />WITHIN 2' OF REGISTER - MIN FLEX
<br />DUCT LENGTH IS 3'2' SO THAT ALL
<br />DUCTS SHALL DISPLAY THE DUCT
<br />SIZE AND INSULATI❑N VALUE AND
<br />MAX LENGTH IS 10' FOR ❑SHPD, 5'0'
<br />FOR ALL OTHERS. ALL ELBOW
<br />RADIUS'S TO BE 1.5 DUCT DIAMETER,
<br />FLEX DUCT TURNS TO BE 2.0 DUCT
<br />MAMETER
<br />T -BAR REGISTER
<br />DETAIL
<br />T CEILING SYSTEM
<br />2 OUTLET - WTC10#
<br />SM SCREW OR #12
<br />SLACK WIRE ON
<br />POSITE CORNERS
<br />TE:
<br />CURE CEILING OUTLET TO S.A.T,
<br />[LING GRID WITH (2) #10x1/2' S/M
<br />REWS THRU OUTLET FLANGE TO
<br />ID RUNNER AND AT DIAGONAL
<br />RNERS INSTALL (2) #12 GA. SLACK
<br />RES ATTACHED TO STRUCTURE
<br />7VE USING CLOSED LOOP EYEBOLTS,
<br />WIRE AND SCREWS ARE REQUIRED ON
<br />ALL REGISTERS,
<br />2018-025"5
<br />GDMD ENGINEERING, INC
<br />Mechanical and Safety Engineers
<br />212 W Pine St, Ste 4
<br />Lodi, Ca 95242
<br />Ph 209-367-0899
<br />Fax 209-367-0898
<br />E-mail :gdmdengrinc@sbcglobal, net
<br />api COPYRIGHT 2017
<br />REV'SIONS
<br />THIS DOCUMENT, AND THE IDEAS AND DESIGNS
<br />INCORPORATED HERFIN, AS AN INSTRUMENT OF
<br />PROFESSIONAL SERVICE, IS THE PROPFRTY OF
<br />"api' AND IS NOT TO BE USED, IN WHOLF OR IN
<br />PART, FOR ANY OTHFR PROJECT WITHOUT
<br />WRITTEN AUTHORIZATION.
<br />w
<br />F-
<br />0
<br />z
<br />06
<br />Q
<br />n
<br />LU
<br />J
<br />n
<br />fU
<br />U
<br />In
<br />U
<br />z
<br />U
<br />LL!
<br />PLANNING ■ ■ ■
<br />ARCHITECTURE ■ ■
<br />ARCHITECTURE PLUS INC.
<br />4335-B NORTH STAR WAY
<br />MODESTO, CA 95356
<br />ph. 209.577.4661
<br />N. 209.577.0213
<br />www.apiarc.com
<br />FRANK C. BOOTS
<br />JOSEPH L. SMITH
<br />RODNEY C. ALONZO
<br />ARCHITECTS
<br />.J
<br />W
<br />N
<br />TZ z
<br />i. �
<br />V�
<br />W W
<br />Z
<br />W
<br />pNAL
<br />OAF. G. Dq Qi
<br />r
<br />Lf) REN: 6�ik i8
<br />�CHA \ r_' �
<br />OF CPL\
<br />DATE :
<br />JANUARY 2018
<br />JOB NO.:
<br />\(E)2x6'S 24'
<br />❑C
<br />�N)2x6
<br />DRAWN:
<br />(E)4x R©❑
<br />PURL❑INS
<br />DUCT ON ROOF -SEE
<br />SPECIFICATIONS FOR INSULATION-- --
<br />GASKET - 1/4' NEOPRENE
<br />18 GA WELDED CURB W/2x NAILER
<br />14' MIN HT, PITCH TO MATCH R❑QFC
<br />ATTACH TO CURB W/4#10x1' \
<br />SM SCREWS 1 EA
<br />LONG SIDE OF UNIT AT CORNERS
<br />2x WOOD NAILER
<br />26 GA GI
<br />C❑UNTERFLASHING
<br />FILL VOID SPACE W/
<br />RIGID INSULATI❑N
<br />FINISH ROOFING - ROLL
<br />UP CURB AND ATTACH
<br />NAILER
<br />CANT STRIP BY R❑OFEF�
<br />1/4'Ox3-1/2' LAG BOLT - EMBED
<br />3' MIN, PLACE 2 EA SIDE
<br />(E)2x6 FRAMING
<br />3-16d NAILS
<br />2x BLOCKING BY
<br />SHEET METAL DUCT W/ SEAL AIRT
<br />INSULATION THRU ROOF -
<br />DUCT CURB MOUNT
<br />EIAIL
<br />NECK SI
<br />ED
<br />CR -1 R6 PLENUM
<br />4-#12GA CEILING WIRES TO
<br />SUPPORT 1' THICK DUCT BOARD
<br />ELBOW AND REGISTER. ATTACH
<br />REGISTER TO T -BAR W/(2)
<br />#7x1/2' S/M SCREWS THRU
<br />OUTLET FLANGE TO GRID RUNNER
<br />ON ❑PPOSIT€ CORNER
<br />N
<br />N
<br />2'x24 GA GI DUCT SUPPORT STRAP
<br />WITHIN 2' OF REGISTER - MIN FLEX
<br />DUCT LENGTH IS 3'2' SO THAT ALL
<br />DUCTS SHALL DISPLAY THE DUCT
<br />SIZE AND INSULATI❑N VALUE AND
<br />MAX LENGTH IS 10' FOR ❑SHPD, 5'0'
<br />FOR ALL OTHERS. ALL ELBOW
<br />RADIUS'S TO BE 1.5 DUCT DIAMETER,
<br />FLEX DUCT TURNS TO BE 2.0 DUCT
<br />MAMETER
<br />T -BAR REGISTER
<br />DETAIL
<br />T CEILING SYSTEM
<br />2 OUTLET - WTC10#
<br />SM SCREW OR #12
<br />SLACK WIRE ON
<br />POSITE CORNERS
<br />TE:
<br />CURE CEILING OUTLET TO S.A.T,
<br />[LING GRID WITH (2) #10x1/2' S/M
<br />REWS THRU OUTLET FLANGE TO
<br />ID RUNNER AND AT DIAGONAL
<br />RNERS INSTALL (2) #12 GA. SLACK
<br />RES ATTACHED TO STRUCTURE
<br />7VE USING CLOSED LOOP EYEBOLTS,
<br />WIRE AND SCREWS ARE REQUIRED ON
<br />ALL REGISTERS,
<br />2018-025"5
<br />GDMD ENGINEERING, INC
<br />Mechanical and Safety Engineers
<br />212 W Pine St, Ste 4
<br />Lodi, Ca 95242
<br />Ph 209-367-0899
<br />Fax 209-367-0898
<br />E-mail :gdmdengrinc@sbcglobal, net
<br />api COPYRIGHT 2017
<br />REV'SIONS
<br />THIS DOCUMENT, AND THE IDEAS AND DESIGNS
<br />INCORPORATED HERFIN, AS AN INSTRUMENT OF
<br />PROFESSIONAL SERVICE, IS THE PROPFRTY OF
<br />"api' AND IS NOT TO BE USED, IN WHOLF OR IN
<br />PART, FOR ANY OTHFR PROJECT WITHOUT
<br />WRITTEN AUTHORIZATION.
<br />w
<br />F-
<br />0
<br />z
<br />06
<br />Q
<br />n
<br />LU
<br />J
<br />n
<br />fU
<br />U
<br />In
<br />U
<br />z
<br />U
<br />LL!
<br />PLANNING ■ ■ ■
<br />ARCHITECTURE ■ ■
<br />ARCHITECTURE PLUS INC.
<br />4335-B NORTH STAR WAY
<br />MODESTO, CA 95356
<br />ph. 209.577.4661
<br />N. 209.577.0213
<br />www.apiarc.com
<br />FRANK C. BOOTS
<br />JOSEPH L. SMITH
<br />RODNEY C. ALONZO
<br />ARCHITECTS
<br />.J
<br />W
<br />N
<br />TZ z
<br />i. �
<br />V�
<br />W W
<br />Z
<br />W
<br />pNAL
<br />OAF. G. Dq Qi
<br />r
<br />Lf) REN: 6�ik i8
<br />�CHA \ r_' �
<br />OF CPL\
<br />DATE :
<br />JANUARY 2018
<br />JOB NO.:
<br />17-057
<br />DRAWN:
<br />A. BARROZO
<br />CHECKED:
<br />G. DAVIS
<br />SHEET
<br />MO
<br />U
<br />a
<br />a
<br />0
<br />00
<br />
|