My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
O
>
120 (STATE ROUTE 120)
>
17000
>
2900 - Site Mitigation Program
>
PR0523467
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 4:01:48 PM
Creation date
4/2/2020 4:35:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0523467
PE
2965
FACILITY_ID
FA0007060
FACILITY_NAME
WINE GROUP, THE
STREET_NUMBER
17000
Direction
E
STREET_NAME
STATE ROUTE 120
City
RIPON
Zip
95366
APN
24506030
CURRENT_STATUS
01
SITE_LOCATION
17000 E HWY 120
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INCIDENT NOTIFICATION <br /> The following incidents shall be reported immediately to the project <br /> engineer and to the guard station. <br /> • Major accidents involving a contractor employee. <br /> • Any accident involving a Wine Group employee. <br /> • Any fire. <br /> • Any incident where hazardous chemicals are released. <br /> • Any incident that impairs the Fire Sprinkler System. <br /> The contractor(s) involved will complete a full incident investigation with <br /> the project engineer for any of the above situations. <br /> SAFETY REQUIREMENTS <br /> All contractors and subcontractors shall comply with all of the State of <br /> California's safety requirements per Cal-OSHA. Sonic of these requirements <br /> areas follows: <br /> • A written injury and illness Prevention Program. <br /> • Specific Code of Safe Practices for the jobs being preformed. <br /> • Tailgate safety meetings held and documented at least every 10 <br /> working days. <br /> • Proper first aid materials and training. <br /> • Written Hazard Communication Program with applicable Material <br /> Data Safety Sheets on site. <br /> • Written Lockout / Blockout program when applicable. <br /> • Written Permit Required Confined Spaces program when <br /> applicable. <br /> • Proper personal protective equipment for hazards involved (i.e., <br /> hardhats, eye protection, hearing protection, respiratory protection, <br /> etc.) <br /> • ball protection program. <br /> • Welding safety program. <br /> • All required posters, employee notifications and emergency phone <br /> numbers. <br /> .May 2000 Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.