Laserfiche WebLink
Kennedy/Jenks Consultants <br /> 5.4.4 Data QA/QC Review <br /> Soil data received from the agricultural laboratory will be reviewed for precision, accuracy and <br /> completeness. Any discrepancies will be resolved with the laboratory immediately. <br /> 5.5 Process Water Treatment Evaluation Work Plan Schedule <br /> The work outlined in the PWTE Work Plan will be implemented by the following schedule: <br /> • 21 June 2004 — Submit Process Water Treatment Evaluation Work Plan <br /> • 16 July 2004— Select a certified laboratory for analytical work <br /> • 1 July 2005 — Complete vineyard soil sampling <br /> • 1 December 2005— Submit Process Water Characterization and Process Water Treatment <br /> Evaluation Report to CRWQCB. <br /> Groundwater Protection Work Plan, The Wine Group Page 5-4 <br /> Franzia Winery, Ripon, California <br /> gisB A .0�7cJ12rn wrce0ro-t.,izm;aM�e L'xLaa', <br />