My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1022
>
2900 - Site Mitigation Program
>
PR0534875
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 1:40:37 PM
Creation date
4/7/2020 1:26:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0534875
PE
2960
FACILITY_ID
FA0020170
FACILITY_NAME
AAA TRUCK WASH/JIMCO TRUCK PLAZA
STREET_NUMBER
1022
Direction
E
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102004
CURRENT_STATUS
01
SITE_LOCATION
1022 E FRONTAGE RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Work Platrbr Additional Site Assessment <br /> Jimco Truck Plaza <br /> I <br /> C A M B RI A 1022 Frontage Road <br /> Ripon, California <br /> j May 18, 2005 <br /> uppermost perforation. The sandpack will be sealed with at least 2 feet of hydrated bentonite chips. <br /> The remaining annular space will then be sealed with cement grout. The wellhead will be completed <br /> below grade and will be protected by a traffic-rated monitoring well vault with a water-tight lid. <br /> j The groundwater monitoring well will be developed approximately 72 hours after installation is <br /> complete. The well will be intermittently surged with a surge block, and groundwater will be <br /> i <br /> evacuated using a bailer or submersible pump until the groundwater is visibly clear and/or has a low <br /> turbidity. During purging, measurements of temperature, pH, conductivity, and turbidity will be <br /> recorded on monitoring well purge and development forms. The new groundwater monitoring well <br /> will be sampled as part of the ongoing quarterly monitoring program at the site. <br /> 5.3 Depth Discrete Groundwater Sampling <br /> Depth discrete groundwater samples will be collected in a soil boring drilled using hollow stem augers <br /> advanced on the west side of the former USTs. Grab groundwater samples will be collected at depths <br /> of approximately 30, 45, and 60 feet bgs to delineate the vertical extent of hydrocarbons and fuel` <br /> S �Aoxygenates in groundwater. Actual sample depths are subject to change should unexpected conditions alfo/ <br /> be encountered in the field(i.e. low yield aquifer,etc.). <br /> Depth discrete groundwater samples will be collected using the Hydropunch®sampling system. The <br /> Hydropunch® sampler is driven approximately 4 ft below the bottom of the augers whereupon the <br /> approximately 1 ft of screen casing is exposed to allow groundwater to infiltrate hydrostatically from <br /> the formation. Clean disposable tubing connected to the sampler is then used to collect a depth <br /> discrete groundwater sample. After collecting each sample, sampler is. retrieved to the surface, <br /> decontaminated, and prepared for the next Hydropunch®groundwater sample. Upon collecting-the <br /> final sample, the borehole will be tremie grouted with neat cement and completed at the surface to <br /> match the existing grade. <br /> 5.4 Well Survey <br /> Upon completing the drilling activities, Cambria will retain the services of a licensed surveyor to <br /> I <br /> survey the coordinates and elevations of the new monitoring well and soil boring, as well as <br /> unsurveyed wells MW-9 and EW-1. Survey data will be tied to a local benchmark. <br /> I <br /> 5.5 Chemical Analysis <br /> Select soil and depth discrete groundwater samples collected during the site assessment activities will <br /> be analyzed for TPHg by modified EPA Method 8015C,TPHd with silica gel cleanup by modified <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.