Laserfiche WebLink
01 August 2019 AdvancedGeo <br /> AGE Project No. 05-1278 Environmental <br /> Page 4 of 23 -� <br /> part 112. This Plan is valid only to the extent that the Facility owner or operator maintains, <br /> tests, and inspects equipment, containment, and other devices as prescribed in this Plan. <br /> 2.3. LOCATION OF THE SPCCP - 40 CFR 112.3(e) <br /> In accordance with 40 CFR 112.3(e), a complete copy of this plan is maintained at the <br /> facility office. The office is attended whenever the facility is operating. <br /> 2.4. PLAN REVIEW - 40 CFR 112.3 and 112.5 <br /> Technical and administrative plan reviews occur for changes in Facility configuration, as <br /> a scheduled five-year plan review and are recorded on the Record of Plan Review form <br /> included as Table 1. <br /> 2.4.1. Changes in Facility Configuration <br /> In accordance with 40 CFR 112.5(a), the Facility periodically reviews and evaluates this <br /> Plan for any change in Facility design, construction, operation, or maintenance that <br /> materially affects the Facility's potential for an oil discharge, including, but not limited to: <br /> • Commissioning of containers. <br /> • Reconstruction, replacement, or installation of piping systems. <br /> • Construction or demolition that might alter secondary containment structures; or <br /> • Changes of product or service, revisions to standard operation, modification of <br /> testing/inspection procedures, and use of new or modified industry standards or <br /> maintenance procedures. <br /> 2.4.2. Technical Plan Amendment <br /> Plan amendments made to address changes of Facility configuration (Section 2.4.1.) are <br /> referred to as technical amendments and are certified by a PE. Technical Plan <br /> amendment are documented on Table 1. <br /> 2.4.3. Non-Technical Plan Amendment <br /> Non-technical amendments can be certified by the Facility Management/Coordinator and <br /> documented in Table 1. Non-technical amendments include the following: <br />