Laserfiche WebLink
Pep Boys#562 <br /> (j) New,onground or aboveground non-RCRA tank systems or tank systems otherwise exempt <br /> from permitting requirements pursuant to the federal act,with secondary containment,whose <br /> design and installation have been approved by a local agency or agencies, may, at the discretion <br /> of the CUPA, be exempt from the engineering assessment specified in subsection (k) of this <br /> section, provided minimum criteria specified in subsections (j)(1)through (j)(3) of this section <br /> are met. If the CUPA determines to exempt a new tank system from the assessment required <br /> pursuant to this subsection,the exemption shall be for a period of not more than three (3)years <br /> from the date the exemption was granted.The tank system owner or operator shall submit <br /> documentation of local agency approval to the applicable CUPA for review and possible <br /> acceptance in lieu of the assessment specified in subsection (k)of this section. If there is no <br /> CUPA,or the CUPA requests that the Department make a determination,the documentation <br /> shall be submitted to the Department. Not applicable---an exemption has not been granted by <br /> the CUPA. <br /> (j)(1) (1) tank system must have secondary containment capable of containing 100 percent of <br /> the contents of the tank and ancillary piping volume; and—this requirement is satisfied because <br /> all tanks are double walled.See tank specifications in Appendix B. <br /> (j)(2) if the tank system is exposed to precipitation,the secondary containment system must <br /> have sufficient capacity, in addition to that required in subsection (j)(1)of this section,to <br /> contain run-on and infiltration from a 25-year, 24-hour rainfall event; The tanks are located in a <br /> building and are not exposed to precipitation, run-on or infiltration. <br /> (j)(3)tank system secondary containment shall be provided with a leak detection system that is <br /> designed and operated so that it will detect either the failure of the primary and secondary <br /> containment structure or any release of hazardous waste or accumulated liquid in the secondary <br /> containment system within 24 hours, or at the earliest practicable time if the existing detection <br /> technology or site conditions will not allow detection of a release within 24 hours. The tanks are <br /> inspected by Pep Boys employees daily and an inspection log is kept. <br /> (k)The tank system assessment shall include all of the following information: <br /> (k)(1)tank configuration (i.e., horizontal,vertical), material of construction, and gross capacity(in <br /> gallons);See tank configurations, materials of construction and capacities in Table I. <br /> 8 <br />