Laserfiche WebLink
F4Site Preparation and Inslation Instructions <br />TLS -350 UST Monitorintem <br />1. Use a standard 4" tank locking cap, "Evertite" or <br />equivalent, with standard ring adaptor. <br />2. Drill and tap the cap for a 3/8 x 18 NPT cord grip thread <br />(see Figure 23, "Probe Riser Cap Modification"). <br />3. Install a water -tight cable bushing in the 3/8" threaded <br />hole in the top of the cap. Use an appropriate thread <br />sealant to ensure water -tightness. Also install a water- <br />tight cable bushing in the probe junction box in a <br />similar manner. <br />± .062 <br />1.438 375 — 18 N.P.T. <br />' t ` <br />±.062 <br />1.625 <br />�I <br />3 <br />L b3�� <br />Figure 23. Probe Riser Cap Modification. <br />C. INSTALLATION. <br />Install each probe as follows (see Figure 24, "Capacitance <br />Probe Installation Requirements"). <br />lft WARNING: TO AVOID ELECTRICAL SHOCK <br />WHICH COULD KILL YOU, BE SURE AC <br />POWER TO THE MONITOR IS OFF DURING <br />INSTALLATION. <br />Turn OFF power to the TLS -350 system. <br />6 CAUTION: DO NOT INSTALL THE PROBE IF <br />ANY LIQUID OTHER THAN THE PRODUCT TO <br />BE DISPENSED IS IN THE TANK. FAILURE TO <br />COMPLY CAN RESULT IN EQUIPMENT DAM- <br />AGE, INACCURATE INVENTORY CONTROL, OR <br />UNDETECTED POTENTIAL ENVIRONMENTAL <br />AND HEALTH HAZARDS. <br />2. Make sure any liquid other than the product to be <br />dispensed has been pumped out of the tank. <br />ifCAUTION: Capacitance probes contain a glass cyl- <br />inder which can be broken if the probes are dropped <br />or struck during handling and installation. Probes <br />are sensitive measuring devices and should be <br />handled carefully at all times. <br />3. Be sure there is no sludge in the bottom of the tank. <br />Sludge can clog the water -entry hole near the bottom of <br />a capacitance probe, resulting in inaccurate water <br />height readings from the probe. <br />4. Attach the probe cable connector to the mating plug on <br />the top of the probe. Be sure the connector is attached <br />securely by hand tightening the locking ring. <br />22 <br />• <br />" MINIMUM DIA <br />WEATHERPROOF <br />MANHOLE <br />CONCRETE SLAB <br />1/2" RIGID <br />OR PACKED EARTHr1l <br />COR0 GRIP SE ALS <br />PER NEPA 80 <br />SUPPLIED WITH PROBE <br />FROM <br />MONITOR <br />PROBE <br />• <br />WEATHERPROOF <br />STRAIN <br />RELIEF v <br />. JUNCTION BOX WITH <br />1:2 INCH NPT THDS <br />CHAIN <br />16 CUBIC INCH <br />MINIMUM) <br />EPO%V SEAL <br />NFPA <br />PER <br />SPEC <br />20" MIN <br />SEE <br />zNOTE <br />2 -WIPE CABLE <br />SUPPLIED WITH <br />RISER DIMENSION <br />PROBE <br />SHOULD BE 20" TO <br />THE BOTTOM OF <br />THE RISER CAP <br />900"API PIPE <br />SCHEDULE90 <br />CAPACITANCE <br />PROBE <br />TANK <br />(DdI3 <br />nps 6 dI.iI Ine Probe Ieogin. <br />le. A T6" Gia. w u n B' <br />)1-9.1 <br />1.9 1 <br />OrPOe. me exva Probe nei9nl will ne <br />P11b, <br />n me ri e. PIPs, w icn m si ee fi" longer <br />I— Ine minimum In orae, 1. P—i room.I <br />Figure 24. Capacitance Probe Installation Requirements. <br />5. Carefully lower probe into the riser pipe until it gently <br />touches the bottom. <br />ifCAUTION: HANDLE PROBE CAREFULLY! <br />STRIKING OR DROPPING PROBE WILL RESULT <br />IN LOSS OF CALIBRATION AND COULD CAUSE <br />PERMANENT DAMAGE. <br />6. Feed the two -wire probe cable (furnished with each probe) <br />up through the cap bushing and in through the junction <br />box bushing. Leave enough slack in the cable between the <br />cap and junction box to allow the cap to easily reach the <br />riser pipe. In addition, leave enough slack under the riser <br />cap to permit connection to the probe and to allow the <br />probe to rest on the bottom of the tank. <br />7. Using wiring nuts, connect the wires from the probe <br />cable to the probe field wires in the junction box (see <br />Figure 25, "Two -Wire Probe Field Wiring Diagram"). <br />Be sure to observe proper polarity between the probe <br />and monitor wiring during installation. <br />Figure 25. Two -Wire Probe Field Wiring Diagram. <br />101 <br />•I <br />WEATHERPROOF <br />JUNCTION BOX <br />(1 PER PROBE) <br />1/2" RIGID <br />CONDUIT <br />_ <br />y glk <br />• <br />TO <br />FROM <br />MONITOR <br />PROBE <br />• <br />+ Wht <br />Figure 25. Two -Wire Probe Field Wiring Diagram. <br />101 <br />•I <br />