My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DOAK
>
240
>
2800 - Aboveground Petroleum Storage Program
>
PR0528648
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2020 4:29:11 PM
Creation date
4/27/2020 4:07:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0528648
PE
2832
FACILITY_ID
FA0019249
FACILITY_NAME
RIPON FUEL FACILITY
STREET_NUMBER
240
STREET_NAME
DOAK
STREET_TYPE
Blvd
City
RIPON
Zip
95366
APN
25933015
CURRENT_STATUS
01
SITE_LOCATION
240 Doak Blvd
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CROSS REFERENCE MATRIX FOR ONSHORE NON-PRODUCTION FACILITIES <br /> Page <br /> Regulation Description Pagag <br /> Secondary containment for all areas from which a <br /> §112.7(c) discharge of oil could occur(i.e.mobile refuelers, 9 <br /> loading/unloading areas,transformers,oil-filled operational <br /> equipment,etc.) other than bulk containers <br /> §112.7(d) Explanation of impracticability of secondary containment 10 <br /> §112.7(d)(1) Oil spill contingency plan per part 109 <br /> Commitment of manpower,equipment&materials to 10 <br /> §112.7(d)(2) remove a discharge <br /> §112.7(e) Written procedures for inspections and tests 10 <br /> Records of inspections and tests signed and kept 3 years <br /> §I12.7(f)(1) Employee training <br /> §112.7(f)(2) Designated individual accountable for discharge prevention 11 <br /> §112.7(f)(3) Discharge prevention briefings scheduled and conducted <br /> annually <br /> §112.7(g) Security: Procedures the facility uses to secure and control 12 <br /> access to oil <br /> §112.7(h) Loading/unloading rack(excluding offshore facilities) 12 <br /> §112.7(h)(1) Containment for contents of largest compartment 12 <br /> §112.7(h)(2) Warning light/sign,barrier system,wheel chocks,or break 12 <br /> interlock system to prevent departure with connected lines <br /> §112.7(h)(3) Inspect drains and outlets of vehicles 12 <br /> §112.7(i) Brittle fracture or catastrophic failure evaluation 12 <br /> requirements <br /> §112.70) Conformance with state requirements 12 <br /> §112.7(k) Qualified oil-filled operational equipment <br /> §112.7(k)(1) Qualified oil-filled operational equipment: meets criteria 13 <br /> §112.7(k)(2) Alternative requirements to general secondary containment <br /> §112.8,§112.12 Requirements for onshore facilities(excluding production) 13 <br /> §112.8(a), Meet general and specific requirements 13 <br /> §112.12(a) <br /> §112.8(b), <br /> §112.12(b) Facility drainage 13 <br /> v <br /> �.li CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.