My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DOAK
>
240
>
2800 - Aboveground Petroleum Storage Program
>
PR0528648
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2020 4:29:11 PM
Creation date
4/27/2020 4:07:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0528648
PE
2832
FACILITY_ID
FA0019249
FACILITY_NAME
RIPON FUEL FACILITY
STREET_NUMBER
240
STREET_NAME
DOAK
STREET_TYPE
Blvd
City
RIPON
Zip
95366
APN
25933015
CURRENT_STATUS
01
SITE_LOCATION
240 Doak Blvd
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CROSS REFERENCE MATRIX FOR ONSHORE NON-PRODUCTION FACILITIES <br /> Page <br /> Regulation Description Pagag <br /> §112.3(b)(1)or(c) SPCC Plan prepared prior to facility becoming operational <br /> (effective 11/10/2010) <br /> §112.3(d) Professional Engineer(PE)certification with five elements <br /> §112.5(a) Amendment of SPCC Plan <br /> §112.5(b) Review of SPCC Plan at least every 5 years with in <br /> documentation(i.e.a log) <br /> §112.6 Qualified Facilities:Meets qualification criteria 1 <br /> §112.6(a) Tier I Facility 1 <br /> §112.6(a)(3) Plan template and applicable requirements 1 <br /> §112.6(b) Tier 11 Facility 1 <br /> General requirements for SPCC Plans for all facilities and 1 <br /> all oil types <br /> §112.7 Management approval of SPCC Plan 1 <br /> Discussion of facilities,procedures,methods or equipment <br /> not yet fully operational with details of installation and 1 <br /> operational start-up <br /> §112.7(a)(1) General requirements;discussion of facility's conformance 1 <br /> with rule requirements <br /> §112.7(a)(2) Deviations from Plan requirements 1 <br /> Facility description and diagram,type of oil and capacity of <br /> §112.7(a)(3)(i) each container,transfer stations and piping,buried 2 <br /> containers on diagram <br /> §112.7(a)(3)(ii) Discharge prevention measures <br /> 2 <br /> §112.7(a)(3)(iii) Discharge drainage controls <br /> §112.7(a)(3)(iv) Countermeasures for discharge discovery,response and 4 <br /> cleanup <br /> §112.7(a)(3)(v) Methods of disposal of recovered materials in accordance 4 <br /> with legal requirements <br /> Contact list and phone numbers for facility response <br /> §112.7(a)(3)(vi) coordinator,National Response Center,cleanup contractors, 5 <br /> all Federal, State,and local agencies who must be contacted <br /> in case of a discharge <br /> §112.7(a)(4) Spill reporting information 5 <br /> §112.7(a)(5) Spill response 7 <br /> §112.7(b) Failure prediction(sources,quantities,rates,and directions) 8 <br /> iv <br /> �.li CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.