My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003898
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NOWELL
>
26200
>
3500 - Local Oversight Program
>
PR0545614
>
ARCHIVED REPORTS_XR0003898
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2020 4:33:13 PM
Creation date
4/27/2020 4:24:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003898
RECORD_ID
PR0545614
PE
3528
FACILITY_ID
FA0009531
FACILITY_NAME
UFP Thornton LLC
STREET_NUMBER
26200
STREET_NAME
NOWELL
STREET_TYPE
Rd
City
Thornton
Zip
95686
CURRENT_STATUS
02
SITE_LOCATION
26200 Nowell Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' These samples will be analyzed on a normal one-week turnaround <br /> basis <br /> 1 <br /> 4.2 <br /> Report Preparation <br /> A written report will be prepared following receipt of laboratory <br /> analytical results . The report will describe our field <br /> observations, sample collection, laboratory analytical results, <br /> and conclusion regarding the soil and groundwater investigation <br /> activities . The supplementary site investigation report will be <br /> submitted to San Joaquin County Environmental Health Department <br />' within two weeks of completion of field activities and receipt of <br /> laboratory analytical results <br /> 5.0 IMPLEMEN'T'ATION SCHEDULE <br /> The approximate estimated duration for each task and the schedule <br />' for the supplementary site investigation is presented below. The <br /> estimated durations and proposed schedule do not include work <br /> delays due to unfavorable weather conditions, acts of God, labor <br /> strikes, and other events beyond the control of ICES and the <br /> Client. ' <br /> 5.1 Estimated Durations <br /> ACTIVITY ESTIMATED DURATION <br /> (working days) <br /> 1 Permit application and schedule 3 <br /> contractors <br />' 2 Screen for underground utilities 1 <br /> 3 . Collect soil and grab groundwater 1 <br /> samples <br />' 4 . Laboratory analyses 7 <br />' 5 . Prepare report 10 <br /> 5 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.