My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
935
>
3500 - Local Oversight Program
>
PR0545617
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2020 1:16:20 PM
Creation date
4/28/2020 12:53:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545617
PE
3528
FACILITY_ID
FA0005557
FACILITY_NAME
RIPON FARM SERVICE
STREET_NUMBER
935
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102007/2011
CURRENT_STATUS
02
SITE_LOCATION
935 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1 <br /> Analytical Results of Tank Removal,Soil Samples <br /> June 15, 1987 <br /> (mg/kg) ?fM li <br /> Total Volatile <br /> Petroleum <br /> Sample I.D. Hydrocarbons Benzene Xylene Toluene <br /> RFS-1 6.9 ND 111.3 ND <br /> .► RFS-2 15 0.8 2.5 ND <br /> RFS-3 1.7 ND ND ND <br /> RFS-4 ND ND ND ND <br /> mg/kg=ppm,pans per million <br /> ND =Not Detected <br /> I <br /> 2.3 Groundwater Depth <br /> According to the San Joaquin County Department ! of blood Control and Water <br /> Conservation District "Lines of Equal Depth to Groundwater in Wells - Fall 1990" map, <br /> groundwater depth at the site is approximately 20 feet. <br /> 3.0 PROPOSED ASSESSMENT <br /> To determine if soil or groundwater contamination is present in the area of the former <br /> UST's, GeoAudit proposes to drill a total of four (4) soil:11'borin I s to depths of 25 feet. Two <br /> (2) of the borings will be drilling near tanks #1 and #21!(tank pit #1); the other two (2) <br /> borings will be drilled near tanks #3 and #4 (tank pit #2). It is expected that groundwater <br /> will be encountered while drilling the soil borings. Thereforell one water sample will be <br /> collected, via hydropunch (or similar methods), from each tank pit area. If contamination <br /> is observed in the water samples, one or more of the sail borings may be completed as <br /> groundwater monitoring wells. The proposed boring locations pare illustrated in Figure 2. <br /> 4.0 SCOPE OF WORK <br /> Details of the proposed drilling and sampling program are given below: <br /> 1 11 <br /> 1) Prepare a Site Health and Safety Plan in accordance with the Occupational Safety <br /> and Health Guidance Manual for Hazardous W I'ste Site Activities - Prepared by <br /> C3aobgnnl Audit 5-4 1— 2 <br /> 9MX941%p-1%—S.—up1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.