Laserfiche WebLink
' 17 February 2003 <br /> • AGE-NC Project No 95-0137 <br />' Page 2 of 7 <br /> 2 1 1 Soil Vapor System.Monitoring and Sampling <br /> A magnehelic vacuum gauge was used to measure the vacuum potential at the two Inch Influent line <br />' between the blower and extraction wells, the flow rate of extracted soil-vapor (influent) was <br /> measured using an direct measure flow meter The organic vapor concentrations in the extracted soil- <br /> vapor stream was measured before entering the blower(Influent stream)and after exiting the carbon <br /> units (effluent stream) using an organic vapor meter (OVM) equipped with a photo-Ionization <br /> detector PID (Thermo Environmental 580B, 10 OeV, calibrated to isobutylene 100 ppb) Field <br /> measurements, recorded at regular Intervals between September and late December 2002, are <br /> summanzed in Table 1 <br /> Soil-vapor samples were collected to document trends In concentrations of hydrocarbon vapor in the <br /> Msoil v apor e xtracted b y t he S VE n etwork and to d etermine t he t reatment s ystem h ydrocarbon <br /> destruction rate Soil-vapor samples from the influent and effluent stream and one inlet sample were <br /> collected in Tedlar vapor hags on 21 October,21 November and 12 December 2002 using a vacuum <br /> pump attached to the influent and effluent stream The samples were labeled,placed in a pre-chilled <br /> cooler and transported under chain-of-custody to transported to McCampbell Analytical Inc (MAI) <br /> a California Department of Health Services(DHS)-certified laboratory in Pacheco,California, The <br /> samples were analyzed for <br /> • Total petroleum hydrocarbons quantified as gasoline (TPH-g) in accordance with EPA <br /> Method 8015 Modified, and <br /> • Benzene, toluene, ethylbenzene and total xylenes (BTEX) and methyl tertiary butyl ether <br /> (MTBE) in accordance with EPA Method 8020 �- <br /> 2 1 2 In-Situ Air Sparging Monitoring and Maintenance <br /> The EnvioSparge IAS system was monitored and serviced over the quarter Regular measurements <br /> of the dissolved oxygen in the ground water wells since the Initiation of the remediation system have <br /> shown a low to moderate dissolved oxygen Increase in ground water wells Consequently the <br /> ' sparging flow rate was adjusted to approximately 4 standard cubic feet per minute (scfin) and to a <br /> pressure of 5 pounds per square inch(psi) <br /> 2 2 WELL CASING ELEVATION SURVEY <br /> ' On 22 November 2002, a California state-licensed survey engineer from Baumbach & Piazza Inc <br /> surveyed a reference point on the top of each ground water monitoring well casing at the site to the <br /> nearest 0 01-foot relative to the San Joaquin County Bench Mark No M-37, at an elevation of <br /> Advanced GeoEnvironmental,Inc <br />