My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
8200
>
3500 - Local Oversight Program
>
PR0545621
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:57:04 PM
Creation date
4/28/2020 1:57:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545621
PE
3528
FACILITY_ID
FA0003977
FACILITY_NAME
SPEEDY FOOD #2*
STREET_NUMBER
8200
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
CURRENT_STATUS
02
SITE_LOCATION
8200 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- � 1 <br /> EXHIBIT F -Analysis of bids received <br /> Project I - Domestic water well investigation cost estimates. <br /> WEGE - $950. <br /> Griound Zero - $915. <br /> JJW- $985. <br /> Project 2 - Soil removal and disposition. <br /> WEGE - $17,350 (Thorpe Oil.) <br /> Ground Zero - Did not bid <br /> JJW - $17,717.63 <br /> Thorpe Oil - $17,350 <br /> Project 3 - Soil boring placement & well location investigation. <br /> WEGE - $6500. Soil & water sample analysis - $161/each. <br /> Ground Zero - $6626. Soil & water sample analysis - $196/each. <br /> JJW - $5414. Soil & water sample analysis - $150/each. <br /> Project 4 - Report preparation. <br /> WEGE - $1500 <br /> Ground Zero - $1210. <br /> JJW - $965. <br /> NOTE: The approved workplan was prepared by Wm. J. Hunter & Associates at a <br /> cost of $1650.00. <br /> -SUMMARY OF ABOVE COST ESTIMATES & PROPOSED BUDGET FOR <br /> '.COMPLETION OF WORK: <br /> Workplan preparation; (completed:) $1,650.00 <br /> Project 1 - average of three bids: $950.00 <br /> Project 2 -`average of three bids: $17,423.00 <br /> Project 3 - average of three bids: $6,180.00 <br /> Laboratory analysis - average of 3 bids: $169/sample. <br /> .Samples taken at 5 foot intervals in each soil boring - total of 32 samples (soil and <br /> water,} at $169/each: $5408.00 <br /> Project 4 - average of three bids: $1,225.00 <br /> TOTAL ESTIMATED COST: $32,836.00 <br /> A letter of commitment has been issued for Claim No. 12586 in the amount of <br /> $10,000, with a deductible of $5,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.