Laserfiche WebLink
- � 1 <br /> EXHIBIT F -Analysis of bids received <br /> Project I - Domestic water well investigation cost estimates. <br /> WEGE - $950. <br /> Griound Zero - $915. <br /> JJW- $985. <br /> Project 2 - Soil removal and disposition. <br /> WEGE - $17,350 (Thorpe Oil.) <br /> Ground Zero - Did not bid <br /> JJW - $17,717.63 <br /> Thorpe Oil - $17,350 <br /> Project 3 - Soil boring placement & well location investigation. <br /> WEGE - $6500. Soil & water sample analysis - $161/each. <br /> Ground Zero - $6626. Soil & water sample analysis - $196/each. <br /> JJW - $5414. Soil & water sample analysis - $150/each. <br /> Project 4 - Report preparation. <br /> WEGE - $1500 <br /> Ground Zero - $1210. <br /> JJW - $965. <br /> NOTE: The approved workplan was prepared by Wm. J. Hunter & Associates at a <br /> cost of $1650.00. <br /> -SUMMARY OF ABOVE COST ESTIMATES & PROPOSED BUDGET FOR <br /> '.COMPLETION OF WORK: <br /> Workplan preparation; (completed:) $1,650.00 <br /> Project 1 - average of three bids: $950.00 <br /> Project 2 -`average of three bids: $17,423.00 <br /> Project 3 - average of three bids: $6,180.00 <br /> Laboratory analysis - average of 3 bids: $169/sample. <br /> .Samples taken at 5 foot intervals in each soil boring - total of 32 samples (soil and <br /> water,} at $169/each: $5408.00 <br /> Project 4 - average of three bids: $1,225.00 <br /> TOTAL ESTIMATED COST: $32,836.00 <br /> A letter of commitment has been issued for Claim No. 12586 in the amount of <br /> $10,000, with a deductible of $5,000.00 <br />