Laserfiche WebLink
Interim Groundwater Treatment System <br /> Operation, Maintenance, and Monitorinz Manual <br /> 2.2 SHUTDOWN PROCEDURE <br /> 1. To shut down the pump, simply flip the pump circuit breaker within the fenced <br /> compound to the off position. <br /> 2. Close the valve to the well. <br /> 2.3 EMERGENCY SHUTDOWN PROCEDURE <br /> 1. Shut off main power at fuse box behind store. <br /> 2. Flip the pump circuit breaker within the fenced compound to the off position. <br /> 3. Close the valve to the well. <br /> 4. Contact Ground Zero Analysis, Inc. (209-838-9888) <br /> roek\o&mman1 <br /> D--- n <br />