My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
11396
>
3500 - Local Oversight Program
>
PR0545624
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:59:15 PM
Creation date
4/29/2020 12:50:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545624
PE
3528
FACILITY_ID
FA0003786
FACILITY_NAME
T&T TRUCKING INC
STREET_NUMBER
11396
Direction
N
STREET_NAME
STATE ROUTE 99
STREET_TYPE
RD
City
LODI
Zip
95240
APN
05926010
CURRENT_STATUS
02
SITE_LOCATION
11396 N HWY 99 RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I� r- <br /> Mr. Michael Infurna <br /> October 24, 2005 <br /> Page 2 <br /> I + <br /> In air sparging, pressurized air is injected into the saturated water-bearing zone of <br /> an aquifer. Air sparging as a site remediation technology serves to volatilize <br /> contaminants from the liquid to vapor phase, and provide oxygen (0� for biologic <br /> activity and microorganism growth. The purpose of this pilot test is to determine <br /> the ROI for AS and the concentration of O2 in groundwater in surrounding wells. <br /> PHASE I <br /> E The purpose of the new extraction well VEW-1 will be to extract petroleum <br /> E hydrocarbons from the soil and groundwater in the source area of the <br /> hj { groundwater plume, thereby reducing constituent mass. The purpose of the new <br /> �� extraction well VEW-2 will be to determine the ROI from VEW-1. The results <br /> will be used in the design of an interim remediation measure, as part of a final <br /> L remediation plan. <br /> To accomplish these objectives, the following tasks will be completed: <br /> I, <br /> • advance an 8-inch diameter hollow stem auger boring for VEW-1 to a depth <br /> f� of approximately 60 feet (ft) below ground surface {bgs), approximately <br /> 1 10 ft east of MW-1 as shown on Figure 2; <br /> • advance an 8-inch diameter hollow stem auger boring for VEW-2 to a depth <br /> of 60 ft bgs,approximately 20 ft southeast of VEW-1 as shown on <br /> Figure 2; <br /> place a 3-inch diameter schedule 40 polyvinyl chloride (PVC) casing with <br /> 0.020-inch slot screen in each borehole with construction details as shown in <br /> Table 1; <br /> * place cuttings into Department of Transportation (DOT) approved 55-gallon <br /> drums or a lined roll-off container, <br /> • survey the well locations using a licensed land surveyor; and <br /> • characterize and coordinate disposal of investigation derived waste. <br /> E <br /> G <br /> P:\28000\128253-T&T Trucking SVE\Work Plan sve 2.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.