My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHTH
>
833
>
2200 - Hazardous Waste Program
>
PR0220100
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 2:03:22 PM
Creation date
5/1/2020 4:15:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0220100
PE
2227
FACILITY_ID
FA0002818
FACILITY_NAME
UNION PACIFIC RAILROAD - STOCKTON
STREET_NUMBER
833
Direction
E
STREET_NAME
EIGHTH
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
08801001
CURRENT_STATUS
01
SITE_LOCATION
833 E EIGHTH ST
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1807
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M <br />F x_ <br />1 <br />IT. Audit anld Drill Procedures: <br />A. The following Emergency liesponse Plans are subject to <br />audit <br />J <br />1. The Comprehensive Emerpency Response Plan f <br />or <br />Union Pacific Railroad should be maintained in the <br />office of the Assistant Tice President — Police <br />and Hazardous Material Management Devartment. <br />Individual service unit and major yard Emergency <br />Response Plans will be maintained on site and a <br />coly of each individual plan will be maintained in <br />a library" at the office of the Assistant Tice <br />President — Police and Hazardous Material Man— <br />agement. <br />•rcency response plan audit responsibilities: <br />The Comprehensive Emerrency Response Plan will be <br />audited by the Hazardous Materials Steering Com— <br />mittee. This will be done annually. <br />The individual unit Emergency Response Plans will <br />be audited by the Police and Hazardous Material <br />Management Department. Aa Audit Team of one <br />member from this department and two individuals <br />from other appropriate departments will make an <br />unannounced on site inspection /audit of the unit <br />zmergency 'Response Plan. Dive such audits will be <br />conducted annually. <br />standards and procedures: <br />The Audit Team will meet with the railroad Inci— <br />dent Commander and Tmervency Response Management <br />Team accountable for knowledre and maintenance of <br />the Bmer,vencv Response site Plan. On location <br />visits will last one day. <br />Audits may be announced in advance. but generally <br />there will be no forewarning. <br />Review will be made for Emergency Response Plan <br />accuracy relative to specific facility and current <br />organization and personnel. <br />Review of communication links, including, accuracy <br />of day and night telephone numbers. <br />Review local departmental accountability to ensure <br />that Emergency Response Management Team under— <br />stands the responsibility for each department. and <br />
The URL can be used to link to this page
Your browser does not support the video tag.