Item No. 3 <br /> PC: 9-4-86 <br /> QX-86-4 <br /> Page 5 <br /> The Department of Public Works recommends that the applicant be <br /> required to post a bond or a cash deposit to cover the cost of <br /> any repairs to Corral Hollow Road made necessary by project <br /> traffic. A videotape of the existing road condition would be <br /> required prior to the start of excavation. The applicant is <br /> agreeable to both recommendations, although the amount of the <br /> financial guarantee has yet to be determined. <br /> Land Use: <br /> Excavation, rock processing, and transportation activities will <br /> not conflict with surrounding existing or planned uses. <br /> Existing apricot and almond orchards will be removed during <br /> excavation, but areas not being excavated will remain in agri- <br /> cultural production. <br /> Project activities will be set back a minimum distance of 300 <br /> feet from the centerlines of the Delta Mendota Canal and the <br /> California Aqueduct . The Department of Public Works recommends <br /> that the U. S. Bureau of Reclamation of the California <br /> Department of Water Resources be required to review and approve <br /> the excavation plan. Application referrals have been mailed to <br /> both agencies. Any comments received will be presented at the <br /> public hearing on this application. <br /> Operations will not conflict with Tracy Municipal Airport air <br /> traffic because the project site is not near airstrip flight <br /> paths. Dust along haul roads will be controlled by applica- <br /> tions of water and magnesium chloride, as necessary. <br /> Prevailing winds are from the northwest direction - that is, <br /> from the airport and toward the project site. <br /> Parallel natural gas lines - one owned by Chevron U.S.A. , the <br /> other by P.G .&E - traverse the project site. Excavation will <br /> be set back 50 feet from each side of the gas lines. Project <br /> traffic will cross the lines in a 20-foot stretch at the <br /> northeast corner of the site. Chevron requests that the appli- <br /> cant uncover, refill , and recompact the pipeline sections at <br /> the truck crossing and then construct the road crossing pro- <br /> posed for the Tracy Boulevard access road (see Site Access <br /> above for design) . The applicant is agreeable to Chevron's <br /> request and is in the process of obtaining Chevron' s approval <br /> for the truck crossing improvements. Pacific Gas and Electric <br /> Company has not replied to its application referral , but its <br /> comments are expected in time for the public hearing. <br />