My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005592
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
2402
>
3500 - Local Oversight Program
>
PR0545640
>
ARCHIVED REPORTS_XR0005592
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 2:18:15 PM
Creation date
5/5/2020 1:44:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005592
RECORD_ID
PR0545640
PE
3528
FACILITY_ID
FA0003900
FACILITY_NAME
PACIFIC PRIDE COMMERCIAL FUEL
STREET_NUMBER
2402
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
12506001
CURRENT_STATUS
02
SITE_LOCATION
2402 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21 March 1997 <br /> AGE-NC Project No 95-0173 <br /> Page 3 of 8 <br /> Soils are to be described using the Unified Soil Classification System (USCS) Soil sample <br /> descriptions and PID screening results will be summarized on boring logs prepared in a report of <br /> findings <br /> 3 2 EQUIPMENT DECONTAMINATION <br /> All sampling tools and brass sleeves used for sample collection will be thoroughly rinsed with clean <br /> water after washing with a solution of Alconox Hollow stem augers wilt be steam-cleaned prior to <br /> advancement in each borehole <br /> 3 3 SOIL BORING COMPLETION <br /> The proposed ground water monitoring wells will be completed as 2-inch diameter monitoring wells <br /> using 20 feet of slotted PVC casing Ground water monitoring well design is illustrated in Figure 3 - <br /> Proposed Ground Water Morntoi ing Well Design Monitoring wells will be developed utilizing a <br /> . submersible pump Water will be purged from each well so that each well is essentially sediment free <br /> Purged ground water will be stored on-site in DOT drums in an area inaccessible to the general <br /> public A reference point will be marked on the top of each well head, and surveyed the to the nearest <br /> 0 01-inches to determine the elevation relative to existing wells <br /> The proposed soil vapor extraction wells will be dual-completed as 2-inch diameter soil vapor <br /> extraction (SVE) wells using PVC casings, slotted at independent intervals Soil vapor extraction <br /> well design is illustrated in Figure 4 -Proposed Soil Vapor Extraction Well DeAign <br /> The proposed air sparging well will be completed as a 2-inch diameter sparging well using PVC <br /> casing and five feet of slotted PVC casing The air sparging well design is illustrated in Figure 5 - <br /> Proposed Air Sparging Well Design <br /> 3 4 LABORATORY ANALYSIS <br /> Selected soil and ground water samples will be analyzed for total petroleum hydrocarbon quantified <br /> as gasoline and diesel (TPH-g and TPH-d), volatile aromatics (benzene, toluene, ethylbenzene and <br /> xylenes BTE&X) and methyl-tertiary butyl ether (MTBE) in accordance with EPA methods 8015m <br /> and 8020/602 Laboratory reports of both soil and ground water analysis, testing methods, laboratory <br /> quality assurancelquality control (QA/QC) reports and sample chain-of-custody documentation will <br /> be presented in a report with the findings and recommendations <br /> • Selected samples will also be analyzed for permeability, porosity, soil moisture, percent organic <br />
The URL can be used to link to this page
Your browser does not support the video tag.