Laserfiche WebLink
SUMMARY OF ESTIMATED COSTS <br /> SUBSURFACE ENVIRONMENTAL INVESTIGATION <br /> 4511 PACIFIC AVENUE <br /> STOCKTON, CALIFORNIA <br /> WORK PLAN <br /> Senior Geologist 2 hr @ $110 $220.00 1 <br /> Staff Geologist 4 hr @ $72 $288.00 <br /> Drafter 2 hr @ $40 $80.00 <br /> Administrative 2 hr @ $40 $80.00 <br /> Microcomputer 4 hr @ $15 $60.00 <br /> Well Permits 3 wells @ $89 $267.0 <br /> $995.00 <br /> FIELD OPERATIONS <br /> Staff Geologist <br /> DHUll g/Sampling 18 hrs j <br /> Develop, purge, I <br /> and sample wells lob <br /> 28 hrs @ $72 $2,016.00 <br /> Driller's cost estimate: Includes travel <br /> time, hollow-stem auger drilling, <br /> bentonite powder, steam cleaner $4,000.00 <br /> Monitoring Well Construction Materials $1,500.00 <br /> Field Equipment <br /> RFA Vehicle 2 days @ $50/day $100.00 <br /> Organic vapor meter 2 days @ $100/day $200.00 <br /> Brass sleeves 60 @ $10/ea $600.00 <br /> Well development and sampling equipment $300.00 <br /> $8,716.00 <br /> LABORATORY ANALYSES (2-WEEK TURNAROUND) <br /> Soil Samples (8015, 8020) 6 @ $150/ea $900.00 <br /> Water Samples 3 @ $150/ea $450.00 <br /> $1,350.00 <br /> OFFICE OPERATIONS AND REPORT PREPARATION <br /> Senior Geologist 4 hrs @ $110 $440.00 <br /> Staff Geologist 16 hrs @ $72 $1,152.00 <br /> Drafter 4 hrs @ $40 $160.00 <br /> Administrative 4 hrs @ $40 $160.00 1 <br /> Microcomputer 8 hrs @ $15 $120.00 <br /> Reproduction <br /> $2,052.00 <br /> APPROXIMATE COST $13,113.00 <br /> This estimated budget is based on drilling six soil borings and constructing <br /> three groundwater monitoring wells, collecting and analyzing six soil and three <br /> groundwater samples, and preparing a report. Costs for additional soil borings that <br /> may be necessary to delineate the extent of contamination will be approximately <br /> ROGER <br /> FQDTT <br /> ASSOCIATES <br /> I <br />