My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1711
>
2300 - Underground Storage Tank Program
>
PR0231455
>
INSTALL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 4:58:34 PM
Creation date
5/6/2020 2:47:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1999
RECORD_ID
PR0231455
PE
2361
FACILITY_ID
FA0003612
FACILITY_NAME
Yosemite Avenue Arco AmPm
STREET_NUMBER
1711
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1711 E Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> ARCO #6020 Manteca <br /> Tank Entry <br /> Containment Solutions will inspect the tank and report their findings to the local <br /> agencies upon exit of the tank. A formal report will be submitted at a later date. <br /> Scott Co. will provide a third party engineer to enter the tank once Containment <br /> Solutions completes their entry. This engineer will also provide any additional <br /> status report on the structural integrity and conditions of the Single Wall <br /> Fiberglass Underground Storage Tanks. <br /> We have attached a resume for Keri M. Howell, P.E. who we will be using for <br /> third party engineering services. <br /> Containment Solutions will install striker plates under all tank openings once the <br /> inspection work is complete. A manway will be installed at tank top were the <br /> entry holes were cut for any future access. Containment Solution will perform a <br /> nitrogen test on each system prior to the introduction of any product. <br /> At the completion of the project, a precision tank and line test will be performed <br /> on the tanks. All data will then be submitted to the Health Department to review. <br /> Please feel free to contact me with any questions or should you need additional <br /> information I can be reached at (510) 895-2333 ext. 385. <br /> Very ruly Yours, <br /> I i <br /> AOTT <br /> S . OF CALIFORNIA <br /> Paul Ferriera <br /> Environmental Project Manager <br /> g:Scott Jobs;tank;Ipf021799 <br />
The URL can be used to link to this page
Your browser does not support the video tag.