My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PINE
>
845
>
3500 - Local Oversight Program
>
PR0545658
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 2:59:59 PM
Creation date
5/7/2020 2:49:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0545658
PE
3528
FACILITY_ID
FA0004925
FACILITY_NAME
Caltrans-Lodi
STREET_NUMBER
845
Direction
E
STREET_NAME
PINE
STREET_TYPE
St
City
Lodi
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
845 E Pine St
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' *4./ <br /> Project No. 58100-06-30 <br /> September 15, 1995 <br /> Page 3 <br /> NAW <br /> DRILLING AND SAMPLING <br /> �- Eight soil borings (SBI through S138) were advanced to depths ranging from 7.8 to 14.0 meters <br /> (25.5 to 46 feet) bgs in order to evaluate potential soil and groundwater impacts in the vicinity <br /> of the former refueling operations. Soil boring locations are depicted on the Site Plan, Figure 2. <br /> Borings SBI through SB4 were located within or in the immediate vicinity of the UST excavation. <br /> Borings SB 1 and S132 were advanced through the former UST excavation to aid in evaluating the <br /> maximum potential petroleum hydrocarbon concentrations and depth of vertical migration in native <br /> soil beneath the former USTs. Boring SB2 was advanced to a maximum depth of 14.0 meters (46.r--- <br /> feet) bgs in an attempt to encounter groundwater for monitoring well construction in order to <br /> evaluate groundwater quality. Groundwater was not encountered to a maximum depth of 46 feet--.-- <br /> bgs. <br /> Borings S135, S136, and S138 were located within and in the immediate vicinity of the former <br /> dispenser island. SB5 was advanced within the former dispenser island excavation to a maximum <br /> depth of 9.5 meters (31 feet) to aid in determining the maximum potential petroleum hydrocarbon <br /> concentrations and depth of vertical migration in native soil beneath the former diesel dispenser. <br /> `" S137 was located in the area of the former product piping elbow and was advanced to a depth of <br /> 8.1 meters (26.5 feet) bgs. <br /> v <br /> Soil samples were collected at approximate 1.5 meter (five foot)vertical intervals utilizing a 50.8- <br /> mm (two-inch)diameter split spoon sampler equipped with 152.4-mm-long by 50.8-mm (six-inch- <br /> long by two-inch) diameter stainless steel sample tubes to facilitate sample handling and storage. <br /> 'j The borings were logged under the supervision of a California Certified Engineering Geologist <br /> utilizing the Unified Soil Classification System. The sample tubes were capped, labeled and <br /> chilled pending transport to an analytical laboratory. Soil samples were field screened with a <br /> +.• flame-ionization detector (FID) to assess possible qualitative indicators of volatile organic <br /> compounds. The soil sample locations and FID readings are recorded on the attached boring logs <br /> presented in Appendix B. Drill cuttings generated from the drilling operations were stored onsite <br /> �. in DOT 17H 55-gallon drums pending the receipt of analytical data and subsequent disposal <br /> following regulatory protocol. <br /> Quality assurance/quality control procedures provided during the field exploration activities <br /> included cleansing/rinsing of the sampling equipment and steam cleaning the augers prior to and <br /> between borings. Cleansing/rinsing of the sampling equipment was performed prior to the <br /> collection of each soil sample by washing the equipment with a trisodium phosphate solution <br /> followed by subsequent tap water and deionized water rinses. <br />
The URL can be used to link to this page
Your browser does not support the video tag.