Laserfiche WebLink
I B. Select Backfill: Materials for backfill shall be fine. readily compactible soil or soil-rock , <br /> 2 mixture selected from the excavation, or from other approved sources, and shall not contain <br /> 3 frozen lumps, stones or rock fragments larger than 4 inches, chunks of highly plastic clay, <br /> 4 organic or other objectionable material. Rock fragments over 4 inches may be reused if <br /> 5 processed down to hard fragments less than 4 inches in size. <br /> 6 <br /> 7 C. Imported Select Fill: Material shall consist of silty sand free of organic matter or other <br /> 8 objectionable material, approved by the Engineer, and meeting the following requirements: <br /> s <br /> 10 Minimum 'R' Value: 45 <br /> 11 Maximum Expansion Pressure•(psf) 10 <br /> 12 Maximum Plasticity Index: g <br /> 13 <br /> 14 • Test Method California 301 - Value at 300 psi exudation pressure. <br /> 15 <br /> 16 2.02 DRAIN ROCK <br /> n <br /> 1a Material shall be clean gravel or crushed rock of one-inch (1•) maximum size, with no <br /> 19 material passing a Number four (#4) sieve. <br /> 20 '21 2.03 GEOTEXTILE FABRIC <br /> 22 <br /> 23 A. Type I: Fabric shall be Mirafi 500X, or equal. <br /> 24 <br /> 25 B. Type II: Fabric shall be Mirafi 140N Drainage Fabric, or equal. <br /> 26 <br /> 27 r 28 PART 3: EXECUTION <br /> 29 <br /> 30 3.01 CLEARING <br /> 31 <br /> 32 A. Prior to the beginning of earthwork, the Contractor shall clear all roots, organic matter, <br /> 33 debris, paving, curb, vegetation, and other objectionable material except for trees and <br /> 34 shrubs designated to be saved, from the area within which excavation and grading are to <br /> 35 be conducted, or storage of excavated materials or fill is to be made. <br /> 36 <br /> 37 B. All cleared material shall become the property of the Contractor and shall be disposed of <br /> 38 at a location off the site in a manner satisfactory to the Engineer at the Contractor's <br /> 39 expense. <br /> 40 ,41 3.02 STRUCTURAL EXCAVATION <br /> 42 <br /> 43 A. General: All excavation for structures shall be done to the dimensions and levels indicated <br /> 44 on the drawings or specified herein. Excavation shall be made to such width outside the <br /> 45 lines of the structure to be constructed therein as may be required for proper working <br /> 46 methods, the erection of forms and the protection of the work. Care shall be taken to <br /> 47 preserve the foundation surfaces shown on the drawings in an undisturbed condition. If <br /> 48 the Contractor excavates or disturbs the foundation surfaces shown on the drawings or <br /> 49 specified herein without written authorization of the Engineer he shall replace at his <br /> 50 expense such foundations with compacted gravel foundation fill or other material approved <br /> STRUCTURE EXCAVATION AND BACKFILL <br /> 050594 02225-2 <br />