My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REPUBLIC
>
14720
>
2900 - Site Mitigation Program
>
PR0542085
>
ARCHIVED REPORTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 3:18:39 PM
Creation date
5/7/2020 3:08:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
RECORD_ID
PR0542085
PE
2965
FACILITY_ID
FA0010858
FACILITY_NAME
SJC PUBLIC WORKS /UTILITY-FLAG CITY
STREET_NUMBER
14720
STREET_NAME
REPUBLIC
STREET_TYPE
St
City
LODI
Zip
95242
APN
05532009
CURRENT_STATUS
02
SITE_LOCATION
14720 Republic St
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> I disced, harrowed, or otherwise manipulated after the water is added. If the material is <br /> 2 too wet, the moisture content shall be reduced as necessary by spreading and <br /> 3 aerating. The layers of the fill material shall not exceed 6 inches and each layer shall <br /> 4 be compacted with suitable compaction equipment to provide the specified dry <br /> 5 densities. <br /> 6 <br /> 7 2. The dry density of the compacted fill shall exceed 95 percent of the maximum dry <br /> 6 density. Field density tests shall be used to check the compaction of the fill materials. <br /> 9 Sufficient tests shall be made on each layer by the Engineer to assure adequate <br /> 10 compaction throughout the entire area. If the dry densities are not satisfactory, the <br /> 11 contractor will be required to increase the weight of the roller or the number of passes i <br /> 12 as required to produce the specified densities. <br /> 13 <br /> 14 3. Where trenches must be excavated in Engineered Fill these trenches shall be backfilled <br /> 15 with the fill materials excavated. The backfill shall be placed in 6 inch layers and each <br /> 16 layer compacted with pneumatic tampers to provide densities as specified above. <br /> 17 Backfill placed adjacent to walls shall be placed in a similar manner to that specified <br /> 16 for backfill in excavated trenches. , <br /> 19 <br /> 20 4. No fill shall be placed during weather conditions which will alter the moisture content <br /> 21 of the fill materials sufficiently to make adequate compaction impossible. After placing i <br /> 22 operations have been stopped because of adverse weather conditions, no additional <br /> 23 fill material shall be placed until the last layer compacted has been checked and found <br /> 24 to be compacted to the specified densities. <br /> 25 <br /> 26 3.04 BACKFILL AGAINST STRUCTURES <br /> 27 <br /> 26 Material for filling and backfilling around structures shall be free from sod, large lumps, <br /> 29 boulders, or rocks, roots, brush or other objectionable material, and shall be obtained from <br /> 30 required excavations insofar as practicable. Should the material available from excavation <br /> 31 be insufficient or unsuitable for the required use, the Contractor shall furnish and place <br /> 32 suitable material. Do not place backfill against newly constructed concrete structures for <br /> 33 a period of 14 days unless authorized by the Engineer. Backfill shall be placed as <br /> 34 engineered fill. Hand-held compactors shall be used for backfill against concrete walls. <br /> 35 <br /> 36 <br /> 37 <br /> 36 END OF SECTION <br /> r <br /> STRUCTURE EXCAVATION AND BACKFILL <br /> ososs4 02225- <br />
The URL can be used to link to this page
Your browser does not support the video tag.