My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REPUBLIC
>
14720
>
2900 - Site Mitigation Program
>
PR0542085
>
ARCHIVED REPORTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 3:18:39 PM
Creation date
5/7/2020 3:08:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
RECORD_ID
PR0542085
PE
2965
FACILITY_ID
FA0010858
FACILITY_NAME
SJC PUBLIC WORKS /UTILITY-FLAG CITY
STREET_NUMBER
14720
STREET_NAME
REPUBLIC
STREET_TYPE
St
City
LODI
Zip
95242
APN
05532009
CURRENT_STATUS
02
SITE_LOCATION
14720 Republic St
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 SECTION 02226 <br /> 3 EMBANKMENT CONSTRUCTION <br /> 4 <br /> 5 <br /> 6 PART 1 : GENERAL <br /> 7 <br /> 6 1.01 DESCRIPTION <br /> s <br /> 10 The work of this section consists of performing excavation and constructing embankments <br /> 11 to form the emergency storage pond and perimeter berms. Disposal of surplus or <br /> 12 unsuitable material is included. <br /> 13 <br /> 14 1.02 QUALITY ASSURANCE <br /> 1s <br /> 16 Evaluation of all fill materials and testing required to determine compliance for the work of <br /> 17 this section will be the responsibility of the Owner and at the Owner's expense. The <br /> 18 Contractor shall cooperate by rerouting equipment or by temporarily closing the immediate <br /> 19 work area being tested. Areas where test results indicate noncompliance shall be corrected <br /> 20 before placing additional backfill. <br /> 21 <br /> 22 1.03 RELATIVE COMPACTION TEST <br /> 23 <br /> za Where relative compaction densities are specified in these specifications, the maximum <br /> 25 density shall be determined in accordance with the latest revision of ANSI/ASTM D1557 and <br /> 26 the actual density of in-place materials shall be determined in accordance with the latest <br /> 27 revision of ANSI/ASTM D2922. <br /> 28 <br /> 29 <br /> 30 PART 2: MATERIALS <br /> 31 <br /> 32 2.01 EMBANKMENTS <br /> 33 <br /> 34 A. Embankments shall be made from on-site soils in designated areas within the upper 10 feet. <br /> 35 Clean sands shall not be used. At least ten days prior to the placement of any fill, the <br /> 36 Engineer shall be notified and samples shall be obtained to determine the suitability of the <br /> 37 materials and for conducting moisture and density tests. <br /> 38 <br /> 39 2.02 EROSION PROTECTION MATERIAL <br /> as <br /> 41 Material for erosion protection on embankment slopes shall be as specified in Section <br /> 42 02492. <br /> 43 <br /> 44 <br /> 45 PART 3: EXECUTION <br /> 46 <br /> 47 3.01 CLEARING AND STRIPPING <br /> 48 <br /> 49 Prior to the beginning of earthwork, the Contractor shall clear all roots, trees, organic <br /> 50 matter, debris, vegetation, and other objectionable material from the area within which <br /> EMBANKMENT CONSTRUCTION <br /> 062994 02226-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.