My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REPUBLIC
>
14720
>
2900 - Site Mitigation Program
>
PR0542085
>
ARCHIVED REPORTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 3:18:39 PM
Creation date
5/7/2020 3:08:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
RECORD_ID
PR0542085
PE
2965
FACILITY_ID
FA0010858
FACILITY_NAME
SJC PUBLIC WORKS /UTILITY-FLAG CITY
STREET_NUMBER
14720
STREET_NAME
REPUBLIC
STREET_TYPE
St
City
LODI
Zip
95242
APN
05532009
CURRENT_STATUS
02
SITE_LOCATION
14720 Republic St
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 C. No vertical joints shall occur within 8 inches of external corners of windows, doors, or other <br /> 2 such openings. <br /> 3 <br /> i 4 3.05 WATER RESISTANT WALLBOARD WALL INSTALLATION <br /> 5 <br /> 6 A. Install on all walls of high moisture areas, such as restrooms, including shower, urinal, and <br /> ' 7 water closet areas. <br /> 8 <br /> 9 B. Where wall framing exceeds 16" o.c., provide horizontal blocking or backing for all <br /> ' 10 <br /> horizontal joints to include top of shower. <br /> 11 <br /> 12 C. Precut board to required sizes and make all cutouts. Butt ends and edges. Cut board to <br /> 13 fit by scoring and breaking or by sawing from face side. Board may be installed either <br /> ' 14 horizontally or vertically. Install with face side out. Do not install damaged or damp boards. <br /> 15 <br /> 16 D. Secure to wood with 1-3/8" to 1-7/8" corrosion-resistant annular ring drywall nail or 1-1/4" <br /> 17 to 1-5/8" corrosion-resistant, waferhead or buglehead, coarse thread (Type W) or multilevel <br /> 19 thread (Type S Hi-Lo), sharp point drywall screw. Space fasteners 6" o.c. <br /> 19 <br /> 20 E. For joints and angles in tile or prefinished panel areas: Apply 2" glass fiber tape over joints. <br /> ' 21 Embed tape in adhesive used to set tile or prefinished panels. Allow joints to dry and then <br /> 22 caulk openings prior to setting tile or installing prefinished panels. <br /> 23 <br /> 24 F. For installation as finished material (non-tile or prefinished panel areas): Embed with 2" <br /> 25 1 0x1 0 glass mesh tape set with Georgia-Pacific Speed Set. Trowel Speed set (skim coat) <br /> 26 over entire wallboard panels to produce smooth surface. <br /> ' 27 <br /> za 3.06 WATER RESISTANT WALLBOARD CEILING INSTALLATION <br /> 29 <br /> 30 A. Pre-cut panels to required size and make necessary cut-outs. Install ceiling boards in the <br /> ' 31 direction that will minimize the number of end-butt joints. Stagger end joints at least V-0". <br /> 32 Install with face side out. Do not install damaged or damp boards. Butt boards together <br /> 33 at edges and ends with not more than 1/16" open space between boards. Locate edge and <br /> ' 34 end joint over supports. Do not place tapered edges against cut edges or ends. Install with <br /> 35 1/4" open space where boards abut other work. <br /> 36 <br /> ' 37 B. Tape all joints with 10 x 10 glass mesh tape. Cover joints and entire board surface with <br /> 38 G-P Speed Set Joint Compound or USG Durabond 90 to provide a smooth, even finish. <br /> 39 Let dry 2 hours minimum. Seal surface with alkyd sealer or sealer compatible with specified <br /> 40 painting system. <br /> 41 <br /> 42 3.07 GENERAL REQUIREMENTS FOR FASTENER APPLICATION <br /> 43 <br /> ' 44 A. Install fasteners no closer than 3/8 inch to end or edge. Space fasteners opposite each <br /> 45 other on adjacent ends or edges. Begin fastening from center of gypsum board adjacent <br /> 46 to fasteners being driven to insure that gypsum board will be secured tightly to framing <br /> 47 member. Check for looseness at fasteners. Drive fastener with shank perpendicular to face <br /> 48 of board. <br /> 49 <br /> 50 B. Drive nails with crown-head hammer. Being careful not to break paper, seat nail so that <br /> 51 head is in slight, uniform dimple formed by last blow of hammer. <br /> 52 <br /> GYPSUM DRYWALL CONSTRUCTION <br /> 050694 09251-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.