My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REPUBLIC
>
14720
>
2900 - Site Mitigation Program
>
PR0542085
>
ARCHIVED REPORTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 3:18:39 PM
Creation date
5/7/2020 3:08:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
RECORD_ID
PR0542085
PE
2965
FACILITY_ID
FA0010858
FACILITY_NAME
SJC PUBLIC WORKS /UTILITY-FLAG CITY
STREET_NUMBER
14720
STREET_NAME
REPUBLIC
STREET_TYPE
St
City
LODI
Zip
95242
APN
05532009
CURRENT_STATUS
02
SITE_LOCATION
14720 Republic St
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> 1 C. Second Coat Application: After embedding and covering coat has hardened, apply second <br /> 2 coat, using topping compound, feathered approximately 2 inches beyond edges of first <br /> r 3 coat. Spot fastener heads with similar coat. Allow to dry. <br /> 4 <br /> 5 D. Third Coat Application: After second coat is dry, sand lightly. Apply a thin finishing coat <br /> a of topping compound to joints and fastener heads. Feather joint edges at least 2 inches <br /> ' 7 beyond second coat. Sand lightly when dry. <br /> a <br /> 9 E. Apply joint treatment to butt and end joints, feathering approximately 18 inches. <br /> 10 <br /> 11 F. Finishing Inside Corners: Fold tape along center crease. Butter both sides of corner with <br /> 12 joint compound and apply tape. Apply second and third coats. <br /> 13 <br /> r 14 3.13 FINISHING BEADS AND TRIMS <br /> 15 <br /> 16 A. Apply joint compound to all bead and trim and properly feather out from high point to plane <br /> 17 of surface. Allow to harden. <br /> to <br /> 19 B. Apply second coat in same manner as first coat, extending topping compound slightly <br /> r 20 beyond onto face of panel. <br /> 21 <br /> 22 C. Apply finish coat to all bead and trim, extending topping compound slightly beyond the <br /> 23 second coat and properly feathering from high point to plane of surface. Sand finish coat <br /> ' 24 as necessary when dry to provide a flat, smooth surface ready for decoration. <br /> 25 <br /> 26 3.14 SURFACE FINISHING AND TEXTURING <br /> r 27 <br /> za A. All joint treatment and fastener finishing must be thoroughly dry before surface finishing and <br /> 29 texturing is started. <br /> 30 <br /> ' 31 B. The entire wall or ceiling surface should be lightly sanded or sponged as required to assure <br /> 32 a smooth and even surface. See Section 09900 and 09901 for paint requirements. <br /> 33 <br /> 34 C. Texturing: "Spatter knockdown" texture pattern. <br /> 35 <br /> 36 3.15 PATCHING <br /> ' 37 <br /> 38 Correct all surface damage and defects, leaving work smooth, uniform, without observable <br /> 39 blemishes which will show through the surface finish, and ready for painting or wall <br /> 40 covering. <br /> 41 <br /> 42 <br /> 43 <br /> ' 44 <br /> 45 <br /> 46 END OF SECTION <br /> 1 <br /> r <br /> r GYPSUM DRYWALL CONSTRUCTION <br /> 050694 09251-5 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.