My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REPUBLIC
>
14720
>
2900 - Site Mitigation Program
>
PR0542085
>
ARCHIVED REPORTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 3:18:39 PM
Creation date
5/7/2020 3:08:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
RECORD_ID
PR0542085
PE
2965
FACILITY_ID
FA0010858
FACILITY_NAME
SJC PUBLIC WORKS /UTILITY-FLAG CITY
STREET_NUMBER
14720
STREET_NAME
REPUBLIC
STREET_TYPE
St
City
LODI
Zip
95242
APN
05532009
CURRENT_STATUS
02
SITE_LOCATION
14720 Republic St
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. Exceptions to the Specifications or Drawings shall be clearly defined by the equipment <br /> supplier. Submittal data shall contain sufficient details so a proper evaluation may be made <br /> by the Owner. <br /> G. The Contractor shall coordinate submittal with the work so that project will not be delayed. <br /> This coordination shall include scheduling the different categories of submittal, so that one <br /> will not be delayed for lack of coordination with another. <br /> H. No material or equipment shall be allowed at the job site until the submittal for such items has <br /> been reviewed by the Owner and marked "approved" or "approved as noted". <br /> 1 I. The equipment specifications have been prepared on the basis of the equipment first named <br /> in the Specifications. The Contractor shall note that the second named equipment, if given, <br /> is considered acceptable and equal equipment, but in some cases additional design, options, <br /> ' or modifications may be required to meet Specifications all at no additional cost to the <br /> Owner. <br /> J. The decision of the Owner governs what is acceptable as a substitution. If the Owner <br /> considers it necessary,tests to determine equality of the proposed substitution shall be made, <br /> at the Contractor's expense, by an unbiased laboratory that is satisfactory to the Owner. <br /> i1.5 COORDINATION <br /> A. The Contractor shall coordinate the electrical work with the other trades, code authorities, <br /> utilities, and the Owner; with due regard to their work, towards promotion of a rapid <br /> completion of the project. If any cooperative work must be altered due to lack of proper <br /> supervision of such, or failure to make proper provisions, then the Contractor shall bear <br /> expense of such changes as necessary to be made in the work of others. <br /> ' B. Manufacturer's directions and instructions shall be followed in all cases where such is not <br /> shown on the Contract Drawings or herein specified. <br /> C. The Contractor shall cease work at any particular point, temporarily, and transfer his <br /> operations to such portions of work as directed, when in the judgment of the Owner it is <br /> ' necessary to do so. <br /> ELECTRICAL <br /> 16000 - 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.