My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REPUBLIC
>
14720
>
2900 - Site Mitigation Program
>
PR0542085
>
ARCHIVED REPORTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 3:18:39 PM
Creation date
5/7/2020 3:08:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
RECORD_ID
PR0542085
PE
2965
FACILITY_ID
FA0010858
FACILITY_NAME
SJC PUBLIC WORKS /UTILITY-FLAG CITY
STREET_NUMBER
14720
STREET_NAME
REPUBLIC
STREET_TYPE
St
City
LODI
Zip
95242
APN
05532009
CURRENT_STATUS
02
SITE_LOCATION
14720 Republic St
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> D. Bussing <br /> 1. All bus bars shall be tin plated copper. Bus sizing shall be based on NEMA standard <br /> temperature rise criteria of 65 degrees C over a 40 degrees C ambient (outside the <br /> ' enclosure). <br /> 2. Provide a half capacity neutral bus where a neutral bus is indicated on the drawings. <br /> ' 3. A copper ground bus shall be furnished firmly secured to each vertical section <br /> structure and shall extend the entire length of the switchgear. <br /> 4. All hardware used on conductors shall be high-tensile strength and zinc plated. All <br /> bus joints shall be provided with bellville washers. <br /> IE. Utility Metering <br /> 1. Furnish a separate barriered-off Utility Metering section complete with hinged <br /> sealable door. Bus work shall include provisions for mounting utility company <br /> current transformers and potential transformers or potential taps as required by the <br /> utility company. Provide Service Entrance UL Label and provide necessary <br /> applicable service entrance features per NEC and PG&E requirements. <br /> 2. Service equipment and meter sockets shall be subject to the approval of the PG&E. <br /> The manufacturer shall be responsible for obtaining Utility approval of the <br /> switchboard. <br /> F. Main Breaker <br /> 1. The main protective device shall be fixed mounted, molded case breaker with 22,000 <br /> amp interrupting. The main breaker shall have a 400 amp trip unit. <br /> 2. The main breaker shall have a hasp for padlocking the breaker in the OFF position. <br /> 2.012 POWER DISTRIBUTION PANEL "PDP" <br /> A. General <br /> 1 1. Furnish a vertical free-standing, dead-front type, distribution switchboard section. <br /> Voltage rating shall be 480 volt, 3 phase, 3 wire. Bus amperage rating shall be a <br /> continuous 400 amps. <br /> ELECTRICAL <br /> 16000 - 35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.