My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REPUBLIC
>
14720
>
2900 - Site Mitigation Program
>
PR0542085
>
ARCHIVED REPORTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 3:18:39 PM
Creation date
5/7/2020 3:08:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
RECORD_ID
PR0542085
PE
2965
FACILITY_ID
FA0010858
FACILITY_NAME
SJC PUBLIC WORKS /UTILITY-FLAG CITY
STREET_NUMBER
14720
STREET_NAME
REPUBLIC
STREET_TYPE
St
City
LODI
Zip
95242
APN
05532009
CURRENT_STATUS
02
SITE_LOCATION
14720 Republic St
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 3 - EXECUTION <br /> 3.1 WORKMANSHIP <br /> A. All work in this Section shall conform to the codes and standards outlined herein. <br /> ' B. The Contractor shall employ personnel that are skilled and experienced in the installation and <br /> connection of all elements, equipment, devices, instruments, accessories, and assemblies. All <br /> installation labor shall be performed by qualified personnel who have had experience on <br /> similar projects. Provide first class workmanship for all installations. <br /> C. Ensure that all equipment and materials fit properly in their installations. <br /> D. Perform any required work to correct improper installations at no additional expense to the <br /> Owner. <br /> ' E. The Owner reserves the right to halt any work that is found to be substandard or being <br /> installed by unqualified personnel. <br /> 3.2 CONSTRUCTION METHODS, GENERAL <br /> IA. All wiring shall be neatly bundled and laced with plastic tie-wraps, anchored in place by screw <br /> attached retainer. Where space is available, such as in electrical cabinets, all wiring shall be <br /> run in slotted plastic xireways or channels with dust covers. Wireways or channels shall be <br /> sized such that the wire fill does not exceed 60%. Wires carrying 100 volts and above shall <br /> be physically separated from lower voltage wiring by using separate bundles or wireways with <br /> sufficient distance to minimize the introduction of noise, crossing only at 90 degree angles. <br /> Tie-wraps shall be T&B TY-RAF's or approved equal. <br /> ' B. Where wiring crosses hinged surfaces, provide an"U" shaped hinge loop protected by plastic <br /> spiral wrap. The hinge loop shall be of sufficient length to permit opening and closing the <br /> door without stressing any of the terminations or connections. <br /> ' C. Wireways, retainers, and other devices shall be screw mounted with round-head 316 stainless <br /> steel screws. Glue or sticky back attachment of any type or style shall not be used. <br /> D. All devices and wiring shall be permanently labeled and secured in accordance with <br /> subsections 2.2 NAMEPLATES AND TAGS and 2.3 WIRE. <br /> ' E. All components associated with a particular compartment's or enclosure's function shall be <br /> mounted in that compartment or enclosure. <br /> ELECTRICAL <br /> 16000 - 45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.