My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REPUBLIC
>
14720
>
2900 - Site Mitigation Program
>
PR0542085
>
ARCHIVED REPORTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 3:18:39 PM
Creation date
5/7/2020 3:08:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
RECORD_ID
PR0542085
PE
2965
FACILITY_ID
FA0010858
FACILITY_NAME
SJC PUBLIC WORKS /UTILITY-FLAG CITY
STREET_NUMBER
14720
STREET_NAME
REPUBLIC
STREET_TYPE
St
City
LODI
Zip
95242
APN
05532009
CURRENT_STATUS
02
SITE_LOCATION
14720 Republic St
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' C. CONDUITS AND DUCTS: <br /> 1. Except as expressly indicated or approved, all conduits shall be concealed in or below <br /> floor slabs or in walls. Care shall be exercised to avoid interference with the work of <br /> other trades. This work shall be planned and coordinated with the other trades to <br /> prevent such interference. Pipes shall have precedence over conduits for space <br /> requirements. Exposed conduits shall be neatly arranged with runs perpendicular or level <br /> and parallel to walls. Bends shall be concentric. <br /> ' D. EXCAVATION AND BACK FILLING: <br /> 1. Trenches for all lines below floor slabs and all underground electrical lines shall be <br /> excavated to the required depths. Conduits under floor slabs shall have trenches no <br /> deeper than is required to properly contain bends within walls. <br /> 2. Underground conduits outside of buildings shall have a minimum cover of 24 inches. <br /> Back filling shall be done only after conduits have been inspected. Material for back <br /> filling shall be sand covered by compacted earth back fill. Excavation and back fill of <br /> lines and conduits shall conform to the requirements of the Earthwork Section of these <br /> Specifications, unless modified on plans, and to other entities as required. <br /> 3. At all times during the installation of the electrical distribution system, the Contractor <br /> shall provide barricades, fences, guard rails, etc., to safeguard all personnel, including <br /> small children, from excavated trenches. <br /> E. DEVICE MOUNTING HEIGHTS: <br /> tI. Mounting heights of fixtures and devices shall be as follows unless otherwise indicated <br /> or directed. <br /> ' Wall switches => 48 inches <br /> Convenience outlets => 12 inches <br /> ' Telephone outlets => 54 inches <br /> Bracket fixtures => 7 feet 6 inches <br /> ' F. WIRING, GROUNDING, AND SHIELDING: <br /> 1. It is important to observe good grounding and shielding practices in the generally noisy <br /> ' environment in this application. The shield of shielded cables shall be terminated to <br /> ground at one end only, the shield at the other end shall be encased in an insulated <br /> material to isolate it from ground. <br /> ELECTRICAL <br /> 16000 - 49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.