My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REPUBLIC
>
14720
>
2900 - Site Mitigation Program
>
PR0542085
>
ARCHIVED REPORTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 3:18:39 PM
Creation date
5/7/2020 3:08:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
RECORD_ID
PR0542085
PE
2965
FACILITY_ID
FA0010858
FACILITY_NAME
SJC PUBLIC WORKS /UTILITY-FLAG CITY
STREET_NUMBER
14720
STREET_NAME
REPUBLIC
STREET_TYPE
St
City
LODI
Zip
95242
APN
05532009
CURRENT_STATUS
02
SITE_LOCATION
14720 Republic St
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 . CONTROL OF THE WORK , <br /> G5. 01 Plans and Specifications Furnished. The Contractor will be <br /> furnished free of charge with copies of the plans and ' <br /> specifications as set forth in the Special Provisions . The <br /> Contractor shall retain an approved set of plans and <br /> specifications on the job at all times during the progress of ' <br /> the work . All drawings , specifications and copies thereof <br /> furnished the Contractor shall not be reused on other work, and <br /> are to be returned at the completion of the work. <br /> G5. 02 Supplemental_Drawings . In addition to the drawings , <br /> incorporated in the contract at the time of signing , the <br /> Engineer may furnish such supplemental drawings from time to , <br /> time as may be necessary to make clear , or to define in greater <br /> detail , the intent of the drawings and specifications . In <br /> furnishing such additional drawings and/or instructions , the <br /> Engineer shall have authority to make minor changes in the <br /> work , not involving extra cost, and not inconsistent with the <br /> nature of the work. These supplemental drawings shall become a <br /> part of the contract documents, and the Contractor shall make ' <br /> his work conform to them. <br /> G5. 03 Legal Address of the Contractor. Both the address given in ' <br /> the proposal and the Contractor ' s office in the vicinity of the <br /> work are hereby designated as places to either of which the <br /> drawings, letters, notices, or other articles or communications <br /> to the Contractor may be mailed or delivered. The mailing or ' <br /> delivery at either of these places shall be deemed sufficient <br /> notice thereof upon the Contractor . Nothing herein contained <br /> shall be deemed to preclude the service of any drawing , letter , , <br /> notice, article or communication to or upon the Contractor or <br /> his representative personally . The address named in the <br /> proposal may be changed at any time by written notice from the <br /> Contractor to the Agency. ' <br /> G5. 04 Personal Attention and Superintendence. The Contractor shall <br /> give his personal attention to and shall supervise the work to ' <br /> the end that it shall be faithfully prosecuted . He shall keep <br /> on the work throughout its progress, a competent superintendent <br /> or foreman who shall represent the Contractor in his absence, ' <br /> and shall have complete authority to represent and act for the <br /> Contractor . Whenever the Contractor or his superintendent is <br /> not present on a particular part of the work where it may be <br /> desired to give direction, orders will be given, which shall be ' <br /> received and obeyed by the responsible representative who may <br /> have charge of the particular work in reference to which the <br /> orders are given, or the Engineer may stop the work until the <br /> Contractor or his superintendent arrives. <br /> The Contractor shall be liable for the faithful observation <br /> of any instructions delivered to him or to his authorized ' <br /> G-16 ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.