My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REPUBLIC
>
14720
>
2900 - Site Mitigation Program
>
PR0542085
>
ARCHIVED REPORTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 3:18:39 PM
Creation date
5/7/2020 3:08:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
RECORD_ID
PR0542085
PE
2965
FACILITY_ID
FA0010858
FACILITY_NAME
SJC PUBLIC WORKS /UTILITY-FLAG CITY
STREET_NUMBER
14720
STREET_NAME
REPUBLIC
STREET_TYPE
St
City
LODI
Zip
95242
APN
05532009
CURRENT_STATUS
02
SITE_LOCATION
14720 Republic St
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' to the suitable prosecution of the work, the days on which the <br /> suspension is in effect shall be counted in determining the <br /> required completion date , and shall not otherwise modify or <br /> invalidate any of the provisions of this contract. An exception <br /> to this provision would be in the event of unseasonable or a <br /> protracted period of unfavorable weather beyond that which <br /> could reasonably be expected based on past meteorological data <br /> for the area of work. <br /> If a suspension of the work is ordered by the Engineer due to <br /> the failure on the part of the Contractor to carry out orders <br /> or to perform any provisions of the contract, the days on which <br /> the suspension order is in effect shall be counted in <br /> ' determining completion time, and shall not in any way modify or <br /> invalidate any of the provisions of this contract, and the <br /> Contractor shall not be entitled to any damages or compensation <br /> on account of such suspension or delay. <br /> G5.16 Termination of Contract. Whenever in the opinion of the <br /> Agency the Contractor has failed to supply an adequate force of <br /> ' labor , equipment, or materials or proper quality, or has failed <br /> in any other respect to prosecute the work with the diligence <br /> specified in the contract ; or if he should persistently or <br /> ' repeatedly refuse or fail to comply with laws, ordinances, or <br /> directions of the Engineer; or if he should consistently fail <br /> to make prompt payments to subcontractors , or for labor or <br /> materials, the Agency may give written notice of at least five <br /> ' days to the Contractor and his sureties that if the defaults <br /> are not remedied within a time specified in such notice , the <br /> Contractor ' s control over the work will be terminated. <br /> ' If the Contractor should be adjudged as bankrupt, or make an <br /> assignment for the benefit of his creditors , or if a receiver <br /> ' should be appointed on account of his creditors , or if a <br /> receiver should be appointed on account of his insolvency , the <br /> Agency may declare the Contractor ' s control over the work <br /> terminated, and so notify the Contractor and his sureties. <br /> Upon such termination, the Agency may direct the Engineer to <br /> take possession of and use all or any part of the Contractor ' s <br /> materials, tools, equipment and appliances upon the premises to <br /> complete the work; the Agency assuming responsibility for the <br /> final relinquishment of such equipment at the conclusion of the <br /> work, or sooner , at its option, in as good condition as when it <br /> was taken over , reasonable wear and tear excepted; and the <br /> Agency agrees to pay for such materials and the use of said <br /> equipment a reasonable compensation to be mutually agreeable to <br /> the Agency and the Contractor . <br /> The Engineer may permit the surety to complete or cause the <br /> contract work to be completed, or the Engineer may direct that <br /> all or any part of the wrok to be completed by contract or <br /> G-21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.