My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REPUBLIC
>
14720
>
2900 - Site Mitigation Program
>
PR0542085
>
ARCHIVED REPORTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 3:18:39 PM
Creation date
5/7/2020 3:08:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
RECORD_ID
PR0542085
PE
2965
FACILITY_ID
FA0010858
FACILITY_NAME
SJC PUBLIC WORKS /UTILITY-FLAG CITY
STREET_NUMBER
14720
STREET_NAME
REPUBLIC
STREET_TYPE
St
City
LODI
Zip
95242
APN
05532009
CURRENT_STATUS
02
SITE_LOCATION
14720 Republic St
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G7 . 13 Proof of Compliance with Contract . In order that the <br /> Engineer may_determine compliance with requirements of the <br /> contract not readily enforceable through inspection and tests <br /> of materials or work, the contractor shall , at any time when <br /> requested , submit to the Engineer properly authenticated <br /> documents or other satisfactory proofs as to his compliance , <br /> with such requirements. <br /> G7.14 Change Orders. The Agency may at any time require changes in <br /> the contract drawings or specifications, or changes, additions <br /> to, or deductions from the work performed or the materials to <br /> be furnished. Any such changes, except as indicated in Par . <br /> G8. 02, will be set forth in a contract change order which will <br /> specify , in addition to a complete description of such change, <br /> the work to be done in connection with the change made , the <br /> adjustment of contract time , if any , and the basis of <br /> compensation for such work. <br /> Work called for by a change order shall be performed fully <br /> and completely and in accordance with the original contract <br /> requirements except for the specific change mentioned in the <br /> change order . Drawings accompanying change orders shall be <br /> deemed a part of such change order . Responsibility for any <br /> change or deviation from the contract drawings or <br /> specifications without the authority of a change order shall <br /> rest entirely with the Contractor . However , if ordered in <br /> writing by the Engineer, the Contractor shall proceed with the <br /> work so ordered prior to actual receipt of an approved contract <br /> change order thereof. <br /> Adjustments, if any, in the amounts to be paid the Contractor <br /> by reason of any change order shall be determined as <br /> hereinafter stipulated. <br /> Such changes shall in no way affect , vitiate , or make void <br /> this contract or any part thereof , except that which is <br /> necessarily affected by such changes and is clearly the evident ' <br /> intention of the parties to the contract. <br /> G7.15 Time of Completion. Time is the essence of this contract . ' <br /> The Contractor shall complete all work called for under the <br /> contract within the time set forth in the Special Provisions. <br /> G7 . 16 Unavoidable Delays . The Contractor will be granted an <br /> extensi noof time for completion of the work beyond that named <br /> in the Special Provisions, for delays which may result through <br /> causes beyond the control of the Contractor and which he could <br /> not have provided against by the exercise of care , prudence , <br /> foresight, and diligence. <br /> Unavoidable delays within the meaning of this paragraph shall <br /> G-36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.