Laserfiche WebLink
i <br /> 1 1.03 ENGINEER'S APPROVAL , <br /> 2 <br /> 3 A. Engineer will indicate his approval or disapproval of each submittal, and his reasons for <br /> 4 disapproval. , <br /> s <br /> 6 1. If no corrections are required, the copies will be returned marked ONO EXCEPTIONS <br /> 7 TAKEN' and work may begin immediately on incorporating the material and equipment <br /> 6 covered by the submittal into the project. ' <br /> s <br /> 10 2. If limited corrections are required, the copies will be returned marked *MAKE <br /> 11 CORRECTIONS NOTED•. Work may begin immediately on incorporating the material , <br /> 12 and equipment covered by the corrected submittal into the project. <br /> 13 <br /> 14 3. If insufficient or incorrect data has been submitted, the copies will be returned marked , <br /> 15 'AMEND & RESUBMIT'. No work incorporating the material and equipment covered by <br /> 16 this submittal into the project may begin until the submittal has been revised, <br /> 17 resubmitted, and returned marked either 'NO EXCEPTIONS TAKEN' or 'MAKE <br /> 18 CORRECTIONS NOTED-. ' <br /> 19 <br /> 20 4. If the submittal is unacceptable, the copies will be returned marked 'REJECTED - SEE <br /> 21 REMARKS'. No work incorporating the material and equipment covered by this , <br /> 22 submittal into the project may begin until a new submittal has been made and returned <br /> 23 marked either 'NO EXCEPTIONS TAKEN' or 'MAKE CORRECTIONS NOTED'. <br /> 24 <br /> 25 B. The Contractor shall not change any drawing after it has been marked NO EXCEPTIONS ` <br /> 26 TAKEN or MAKE CORRECTIONS NOTED, or change any approved equipment or material <br /> 27 without written permission of the Engineer. The Contractor shall comply with all submittals <br /> 28 as marked by the Engineer, to the extent applicable. <br /> 29 <br /> 30 C. If more than three submittals for a single item are required because of incorrect or <br /> 31 insufficient data, or the submittal is unacceptable, or because the Contractor wishes to <br /> 32 change previously approved material, then all costs incurred by the Owner for the <br /> 33 Additional review shall be deducted from monies due the Contractor. <br /> 34 <br /> 35 1.04 OPERATION AND MAINTENANCE INSTRUCTIONS ' <br /> 36 <br /> 37 Manufacturer's printed instructions shall include installation instructions, operating <br /> 38 instructions, schematics for electrical and hydraulic systems, maintenance literature, ' <br /> 39 lubrication requirements, and parts lists in accordance with Section 01010-3.09. <br /> 40 <br /> 41 1.05 CERTIFICATES <br /> 42 <br /> 43 For those items called for in individual sections, furnish certificates from manufacturers, <br /> 44 suppliers, or others certifying that materials or equipment being furnished under the <br /> 45 Contract comply with the requirements of these specifications. ' <br /> 46 <br /> 47 1.06 SAMPLES <br /> 48 <br /> 49 Samples shall be of sufficient size to clearly illustrate functional characteristics and full <br /> 50 range of color, texture, and pattern. <br /> 51 <br /> 52 , <br /> SUBMITTALS <br /> osossa 01300-2 , <br />