My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REPUBLIC
>
14720
>
2900 - Site Mitigation Program
>
PR0542085
>
ARCHIVED REPORTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 3:18:39 PM
Creation date
5/7/2020 3:08:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
RECORD_ID
PR0542085
PE
2965
FACILITY_ID
FA0010858
FACILITY_NAME
SJC PUBLIC WORKS /UTILITY-FLAG CITY
STREET_NUMBER
14720
STREET_NAME
REPUBLIC
STREET_TYPE
St
City
LODI
Zip
95242
APN
05532009
CURRENT_STATUS
02
SITE_LOCATION
14720 Republic St
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUBMITTAL REVIEW TRANSMITTAL FORM <br /> FROM: CONTRACTOR'S NAME PROJECT: FLAG CITY <br /> Address WASTEWATER TREATMENT ' <br /> City, State Zip FACILITIES <br /> 1 TO: DEWANTE AND STOWELL 3 TO: <br /> FLAG CITY CONSTRUCTION FIELD OFFICE CONSTRUCTION FIELD OFFICE <br /> ATTN: , Construction Administrator ATTN: <br /> DATE RECD: , Construction Administrator <br /> DATE FWD: DATE RECD <br /> DATE RTND <br /> 2 TO: 4 TO: CONTRACTOR <br /> AT-TW CONSTRUCTION FIELD OFFICE <br /> DATE RECD DATE RTND ATTN' , Project Engineer <br /> NOTE: <br /> Corrections or comments made relative to submittals during this review do not relieve the Contractor from compliance with the t <br /> requirements of the Drawings and Specifications. This submittal is only for review of general conformance with the design concept of <br /> the project and general compliance with the information given in the Contract Documents. The Contractor Is responsible for confirming <br /> and correcting all quantities and dimensions; selecting fabrication processes and techniques of construction; coordinating his work with <br /> that of other trades, and performing his work in a safe and satisfactory manner. <br /> Submittal No. <br /> REVIEW ACTION <br /> Location: <br /> Spec SectPg No <br /> NO EXCEPTIONS TAKEN <br /> Supplier/Subcontractor: <br /> MAKE CORRECTIONS NOTED <br /> Remarks: AMEND & RESUBMIT <br /> REJECT-RESUBMIT <br /> COPIES RETURNED <br /> [DENT DETAILED DESCRIPTION COPIES <br /> NO (PROVIDE ITEMIZED LIST OF CONTENTS OF THIS SENT A B C D NOTES <br /> SUBMITTAL) <br /> i <br /> ❑ We have verified that the material or equipment contained Forwarding Remarks: <br /> in this submittal meets all the requirements specified or <br /> shown (no exceptions) <br /> ❑ We have verified that the material or equipment contained ' <br /> in this submittal meets all the requirements specified or <br /> Shown, except for the following deviations (list deviations, Construction Administrator <br /> attach separate sheet if necessary), Remarks: <br /> Contractor's Representative: , <br /> Remarks: <br /> Protect Engineer ' <br /> DISTRIBUTION: , <br /> SUBMITTALS <br /> 050594 01300-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.