My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
14900
>
2900 - Site Mitigation Program
>
PR0009023
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:47:37 PM
Creation date
5/7/2020 3:57:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009023
PE
2960
FACILITY_ID
FA0004091
FACILITY_NAME
TOWER PARK MARINA
STREET_NUMBER
14900
Direction
W
STREET_NAME
STATE ROUTE 12
City
LODI
Zip
95242
APN
05503015
CURRENT_STATUS
02
SITE_LOCATION
14900 W HWY 12
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr.James Barton <br /> August 7,2002 <br /> Page 3 <br /> the soil borings were found to contain BTEX components at concentrations up to 296 mg/kg(in boring B- <br /> ' 2 located near the roadside dispenser). <br /> Five of the borings were converted to groundwater monitoring wells MW-1 through MW-5 (Figure 2). <br /> ' Groundwater flow measurements conducted since 1993 indicate that groundwater flow is consistently <br /> away from the slough. In June 1993, benzene was detected in all collected groundwater samples and <br /> TPHd was detected in three of the collected samples. Subsequently, free phase petroleum product (free <br /> ' product) was found in well MW-3. Free product was bailed from monitoring well MW-3 on a bi-weekly <br /> basis during June through August of 1993. In May 1994, a passive free product recovery system was <br /> installed in well MW-3. Marina personnel monitored this system on a regular basis and recovered free <br /> product was contained on-site in drums, pending appropriate disposal by marina personnel. This system <br /> ' was removed in October 1995 after it appeared that the free product thickness was reduced to a slight <br /> sheen. The system was replaced in October 1996 since the free product level rebounded after the device <br /> was removed; subsequently, the skimmer was removed in June of 1999 due to lack of effectiveness. <br /> ' The monitoring wells are located on a levee that has been designated as intrinsically unsafe by the Army <br /> Corps of Engineers. Because of this, Reclamation District #548, which regulates activities on the levee, <br /> will not allow work on the levee unless they are fully indemnified, without regard to fault, for possible <br /> failure of the levee. In past correspondence, the RWQCB has requested that remedial efforts, if <br /> necessary, be focused on those that can be accomplished in-situ. <br /> ' Thus, in November 1995, ORC Filter Socks were installed in monitoring wells MW-2, MW-3,and MW4 <br /> to potentially enhance the natural bioremediation process in the vicinity of these wells by the slow release <br /> of oxygen into the groundwater; dissolved oxygen measurements were collected to evaluate the <br /> effectiveness of the socks. Based on the variability in DO measurements and TPHd concentrations since <br /> sock installation, it did not appear that the ORC Filter Socks were effective; it is likely that competing <br /> oxygen demand exists between hydrocarbon-oxidizing bacteria and the peaty, organic-rich soil types <br /> ' beneath the Site. The socks were removed from the wells in July 1996 and dissolved oxygen monitoring <br /> was discontinued. <br /> ' Groundwater monitoring has been conducted since June 1994 in accordance with the RWQCB MRP and <br /> consists of analyzing for TPHd, TPHg, and BTEX. The predominant contaminant identified has been <br /> TPHd, with non-typical TPHg and low concentrations of BTEX components typically present in well <br /> ' MW-3, which contains free product. Groundwater was monitored for dissolved lead and methyl tertiary <br /> butyl ether(MTBE)during the early investigation, and neither was detected. <br /> ' Based on the evaluation of Site parameters included with the Third Quarter 1997 Monitoring Report dated <br /> July 29, 1997, a Risk-Based Corrective Action Human Health Risk Screening Risk Assessment (Risk <br /> Assessment) was recommended at that time. SECOR submitted a Conceptual Site Model (CSM) with a <br /> ' letter dated October 27, 1997, which addressed the RWQCB's concerns that the plume is stable and extent <br /> defined. <br /> On February 23, 2000, Ms. Susan Gahry of SECOR spoke with Ms. Gail Wiggett who informed Ms. <br /> ' Gahry that she had previously verbally approved the CSM submitted to the RWQCB on October 27, <br /> 1997. On March 27, 2000, Ms. Wendy Cohen of the RWQCB advised that a Risk Assessment would not <br /> be needed to obtain Site closure, but that removal of free product in well MW-3 was needed prior to Site <br /> closure. <br /> On April 28, 2000, SECOR received the draft revised MRP from the RWQCB for review and comment <br /> ' based on SECOR's January 28, 2000 document titled"Fourth Quarter 1999 and Groundwater Monitoring <br /> ' 1:\Tower PaMQMR\2002 QMR\Q2_2002\2nd QTR 2002.dm SECOR International Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.