My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
14749
>
2900 - Site Mitigation Program
>
PR0507155
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 9:56:29 AM
Creation date
5/8/2020 9:44:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0507155
PE
2950
FACILITY_ID
FA0007718
FACILITY_NAME
3 B'S TRUCK PLAZA
STREET_NUMBER
14749
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05515026
CURRENT_STATUS
02
SITE_LOCATION
14749 N THORNTON RD
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.a.r <br /> Advanced <br /> GeoEnvironmental, Inc * <br /> 23 October 2007 <br /> AGE-NC Project No. 97-0249 <br /> Mr. Mike Infuma <br /> SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> 600 East Main Street <br /> Stockton, CA 95202 <br /> Subject: Request for After-Hours Drill/Grout Inspection <br /> THREE B'S TRUCK PLAZA, 14749 Thornton Road, Lodi, California <br /> Dear Mr. Infurna: <br /> hi accordance with the San Joaquin County Environmental Health Department(SJCEHD)-approved <br /> Remedial Action Work Plan(dated 31 July 2007)for the site located at 14749 Thornton Road,Lodi, <br /> California,Advanced GeoEnvironmental, Inc. (AGE) is requesting installation of a total nineteen <br /> (19) soil vapor extraction (SVE)/air sparge (AS) wells to commence on 12 November 2007 <br /> (Veteran's Day).AGE anticipates the above referenced well installations to take approximately 5- <br /> work days to complete;furthermore,the above well installations have tentatively been scheduled to <br /> occur with Cascade Drilling Inc. between 12 and 16 November 2007. However, because of <br /> scheduling conflicts with Cascade Drilling Inc. that will occur after 16th November 2007, we are <br /> requesting to schedule an after-hours drill/grout inspection with SJCEHD personnel on 12 November <br /> 2007 to ensure the above referenced scope of work can be completed by 16`h November 2007. <br /> If you have any questions or require additional information, please do not hesitate to contact our <br /> office at(209)467-1006. <br /> Sincerely, <br /> Advanced GeoEnvironmental,Inc. <br /> Z� <br /> Timothy J. Nellar <br /> Project Geologist <br /> i �hsw Rast3, SLOCkLOn.C elifol ma <br /> I eIeplmnc(,2091 46--1006 Fax(2091 467-1 1 1K <br />
The URL can be used to link to this page
Your browser does not support the video tag.