My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013230
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
RIO BLANCO
>
9522
>
2600 - Land Use Program
>
GP-89-14
>
SU0013230
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2020 10:26:46 AM
Creation date
5/8/2020 10:39:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013230
PE
2600
FACILITY_NAME
GP-89-14
STREET_NUMBER
9522
STREET_NAME
RIO BLANCO
STREET_TYPE
RD
City
STOCKTON
Zip
95209-
APN
05510006
ENTERED_DATE
5/5/2020 12:00:00 AM
SITE_LOCATION
9522 RIO BLANCO RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
maintenance, and improvement of storm drainage, water, <br /> sanitary, and street lighting facilities. <br /> h. A State Reclamation Board Permit shall be required for <br /> the drainage discharge into Bishop Cut and Telephone Cut <br /> prior to approval of the site improvement plan. <br /> i. A site improvement plan, prepared by a Registered Civil <br /> Engineer, showing drainage, driveway access details, on- <br /> site parking, existing and proposed utility services, and <br /> grading shall be submitted to the Department of Public <br /> Works for approval. <br /> j . An encroachment permit shall be required for work within <br /> the road right-of-way. <br /> k. The Traffic Impact Mitigation Fee will be required for <br /> this development. The fee is due and payable at the time <br /> of building permit application. The fee is $1, 397. 00 per <br /> 1, 000 gross square feet of building designated as <br /> "Service/Commercial" in the Delta area. The fee shall <br /> be automatically adjusted annually by the Engineering <br /> Construction Cost Index as published by the Engineering <br /> News Record. <br /> 1. A preliminary soils report is required in accordance with <br /> County standards for the purpose of determining the R- <br /> Value for the design of the roads. <br /> M. All traffic signs and markings shall conform to the <br /> Manual on Uniform Traffic Control Devices and San Joaquin <br /> County standards and shall be shown on the improvement <br /> plans. <br /> 2 . PUBLIC HEALTH SERVICES: <br /> a. A soil suitability study as required by Section 10100 of <br /> the San Joaquin County Development Code must be performed <br /> prior to final approval of improvement plans which <br /> indicates that the area is suitable for septic tank <br /> usage. 6 <br /> b. Connection to an approved public water supply system is <br /> required. A test well will be required to meet the <br /> following: <br /> (1) Water quality tested to meet Title 22 , CCR (Safe <br /> Drinking Water Act) , requirements. <br /> (2) Water quantity tested to show an adequate source. <br /> Site Plan Requirements - 2 - (ZR-89-17) <br />
The URL can be used to link to this page
Your browser does not support the video tag.