My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013248
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
17749
>
2600 - Land Use Program
>
QX-90-1
>
SU0013248
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:24:21 AM
Creation date
5/8/2020 10:56:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013248
PE
2600
FACILITY_NAME
QX-90-1
STREET_NUMBER
17749
Direction
E
STREET_NAME
STATE ROUTE 88
City
CLEMENTS
Zip
95227-
APN
01922024
ENTERED_DATE
5/6/2020 12:00:00 AM
SITE_LOCATION
17749 E HWY 88
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring: <br /> -The County shall periodically inspect the excavation to ensure compliance with <br /> minimum setbacks. Modifications shall be required of any work that does not <br /> meet the approved specifications. <br /> Mitieation 6. - If the water table is intersected by the extraction pits, the applicant has <br /> indicated that the pits would be dewatered prior to continued excavation. If <br /> groundwater is encountered, the California Regional Water Quality Control Board <br /> (RWQCB) shall be notified to evaluate the proposed disposal of groundwater. A Waste <br /> Discharge Permit may be required from the RWQCB. If water from the pit is <br /> discharged to the Mokelumne River, a National Pollution Discharge Elimination System <br /> (NPDES) permit will be required. <br /> Implementation Responsibilities: <br /> -If water table is encountered, Applicant submits an excavation plan for operation, <br /> including dewatering and disposal of water to the County Department of Public <br /> Works and the RWQCB. <br /> -County reviews plan in consultation with RWQCB and either approves plan, requires <br /> modifications, or denies approval of excavation within the water table. <br /> Schedule: <br /> -The plan shall be submitted to the County immediately upon, or prior to encountering <br /> the water table. <br /> -Excavation shall not proceed within the water table until the plan is approved. <br /> Monitoring: <br /> -County shall periodically inspect the quarry excavation to ensure that excavation is <br /> not occurring within the water table. <br /> 123 <br />
The URL can be used to link to this page
Your browser does not support the video tag.