My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013248
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
17749
>
2600 - Land Use Program
>
QX-90-1
>
SU0013248
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:24:21 AM
Creation date
5/8/2020 10:56:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013248
PE
2600
FACILITY_NAME
QX-90-1
STREET_NUMBER
17749
Direction
E
STREET_NAME
STATE ROUTE 88
City
CLEMENTS
Zip
95227-
APN
01922024
ENTERED_DATE
5/6/2020 12:00:00 AM
SITE_LOCATION
17749 E HWY 88
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring: <br /> -If mitigation is required County shall ensure that mitigation is implemented. <br /> Mitigation 8. - Depending upon the actual groundwater levels encountered at the gravel <br /> extraction site, topsoil or other material (as approved by the USDA SCS) shall be added <br /> to raise the elevation so that the root zone of crops will not be subjected to saturation <br /> conditions under the reclamation plan. The USDA SCS shall approve the required <br /> amounts and location of additional material to be added. <br /> Implementation Responsibilities: <br /> -Applicant submits plan to the County Planning Department to mitigate potential <br /> adverse impact on agriculture due to shallow groundwater. The plan shall <br /> include a proposed implementation schedule. <br /> -County reviews plan in consultation with the USDA SCS and either approves plan or <br /> requires modifications. <br /> -Applicant implements approved plan. <br /> Schedule: <br /> -The plan shall be submitted and approved by the County prior to initial project <br /> construction. <br /> -The plan may be submitted as part of the detailed project reclamation plan. <br /> Monitoring: <br /> -County shall inspect final reclamation to ensure that it is conducted according to the <br /> approved plan. <br /> Mitigation 9. - A reclamation plan for the project shall be submitted to and approved <br /> by the County and the California Division of Mines and Geology prior to project <br /> operation as required under the Surface Mining and Reclamation Act of 1975 (SMARA). <br /> F <br /> 125 <br />
The URL can be used to link to this page
Your browser does not support the video tag.