My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013248
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
17749
>
2600 - Land Use Program
>
QX-90-1
>
SU0013248
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:24:21 AM
Creation date
5/8/2020 10:56:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013248
PE
2600
FACILITY_NAME
QX-90-1
STREET_NUMBER
17749
Direction
E
STREET_NAME
STATE ROUTE 88
City
CLEMENTS
Zip
95227-
APN
01922024
ENTERED_DATE
5/6/2020 12:00:00 AM
SITE_LOCATION
17749 E HWY 88
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
On the north side of the Mokelumne River, the reclamation plan shall include grading <br /> and drainage patterns which will conduct surface runoff towards the large stock pond in <br /> the southwest corner of the site. Grading and drainage facilities shall be implemented so <br /> as to maintain current runoff levels to the wetland area. <br /> The applicant must also obtain a permit to conduct surface mining operations from the <br /> County (as lead agency under SMARA). <br /> Implementation Responsibilities: <br /> -Applicant's engineer prepares and submits proposed reclamation plan. <br /> -County and California Division of Mines and Geology review reclamation plan and <br /> either approve it or require modifications. <br /> -Applicant implements approved reclamation plan. <br /> Schedule: <br /> -Reclamation plan shall be submitted to and approved by the County prior to initial <br /> . development of the project. <br /> Monitoring: <br /> -County shall inspect final reclamation to ensure that it is conducted according to the <br /> approved plan. <br /> -County shall ensure that surface mining permit is obtain in accordance with SMARA. <br /> Mitigation 10. - To ensure that extraction of 10,000 gallons per day of groundwater will <br /> not impact adjacent wells, a qualified groundwater hydrologist or hydrogeologist shall <br /> conduct an evaluation of the potential impact on existing local groundwater wells. The <br /> selection of the individual or firm to conduct the evaluation shall be subject to approval <br /> by the County and the California Department of Water Resources. The evaluation shall <br /> determine the potential drawdown and area of influence of the extraction from the <br /> project well. If it is determined that project water use could significantly impact local <br /> wells, these wells shall be monitored for project related drawdown. If-significant <br /> F <br /> 126 <br />
The URL can be used to link to this page
Your browser does not support the video tag.